4-1/2 Robert T Martinez Jr St
Austin, TX 78702
Holly Point fishing pier and park lighting
Austin permits filed in October and November 2024 describe a new fishing pier on Lady Bird Lake and park lighting for the path and pier at this address. The Holly Point site plan was approved and released on February 26, 2024; the building permit is expired, and the electrical permit is final.
Summarized from City of Austin records · updated Feb 26, 2024
- Projects
- 4
- 4 filings
- Latest filing
- Feb 26, 2024
- since Feb 26, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit withdrawnPer austin energy wo 638711 on acct:1102250200 provide and install empty underground conduit and two 18 a.e. pull boxes with one riser at a.e. utility pole 413757. this is to provide a.e. underground conduit to replace existing over head #4 acsr. no conductors terminations or metering will be provided. 4 1/2 robert martinez jr. street austin tx 78702
- AppliedJan 14, 2026
- IssuedJan 16, 2026
- !WorkJan '26 – Sep '26
- Final inspection
Marked withdrawn Apr 15, 2026.
1 contact on this project · 1 phone number
Permit & project history
4 projectsPer austin energy wo 638711 on acct:1102250200 provide and install empty underground conduit and two 18 a.e. pull boxes with one riser at a.e. utility pole 413757. this is to provide a.e. underground conduit to replace existing over head #4 acsr. no conductors terminations or metering will be provided. 4 1/2 robert martinez jr. street austin tx 78702
Per austin energy wo 638711 on acct:1102250200 provide and install empty underground conduit and two 18 a.e. pull boxes with one riser at a.e. utility pole 413757. this is to provide a.e. underground conduit to replace existing over head #4 acsr. no conductors terminations or metering will be provided. 4 1/2 robert martinez jr. street austin tx 78702
City of Austin permitElectrical PermitWithdrawn- Record
- 2026-005000 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Construct new fishing pier on lady bird lake and installing park lighting to illuminate path and fishing pier
Construct new fishing pier on lady bird lake and installing park lighting to illuminate path and fishing pier
City of Austin permitElectrical PermitFinal- Record
- 2024-142017 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Construct new fishing pier on lady bird lake and installing park lighting to illuminate path and fishing pier
Construct new fishing pier on lady bird lake and installing park lighting to illuminate path and fishing pier
City of Austin permitBuilding PermitExpired- Record
- 2024-142017 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4-1/2 Robert T Martinez Jr St
What is being built at 4-1/2 Robert T Martinez Jr St?
Austin permits describe a new fishing pier on Lady Bird Lake and lighting for the path and pier. The permits are associated with the Holly Point site plan.
When were permits filed for the Holly Point fishing pier?
The building permit, 2024-142017 BP, was filed October 25, 2024. The related electrical permit, 2024-142017 EP, was filed November 22, 2024.
Is the Holly Point fishing pier permit approved?
The building permit 2024-142017 BP is listed as expired. The electrical permit 2024-142017 EP is listed as final.
What is happening near the City of Austin Parks and Recreation Department?
Permits at 4-1/2 Robert T Martinez Jr St describe a new fishing pier on Lady Bird Lake and park lighting for the path and pier.
Was the Holly Point site plan approved?
Yes. City of Austin case 13150959, filed February 26, 2024, is listed as approved and released.
When will the Holly Point fishing pier open?
The available records do not state an opening date.
Also being built nearby
All of 78702- 2101 Jesse E Segovia StOct 27, 2026Fiesta gardens rehabilitation · 250 m away
- 2106 Jesse E Segovia StMar 2, 2007East austin youth activity building parking lot · 280 m away
- 35 Robert T Martinez Jr StOct 30, 2026Camacho floating dock for kayaks & canoes · 282 m away
- 2200 South Lakeshore BlvdJun 27, 2013Epicsup (r) stand-up paddle board concession · 292 m away
- 4-1/2 Robert T. Martinez Jr. Street · City Of Austin Parks And Recreation DepartmentJan 23, 2024Holly point — new construction — public park and trail project including the construction of a fishing pier and a concrete walkway, addition of benches, and restoration plantings · 301 m away
- 2109 Riverview StMay 19, 2026New construction secondary apartment 1-story with basement 1 bedroom 1 bath with uncovered patio · 342 m away
- 1115 Town Creek DrNov 14, 2024South shore iv · 342 m away
- 2111 Riverview StOct 20, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 343 m away
- 2125 South Lakeshore BlvdJan 21, 2022Lot 1 bar & grill · 343 m away
- 1820 South Lakeshore BlvdFeb 7, 2017Boardwalk trail at lady bird lake revision · 345 m away
- 38 Anthony StApr 19, 2026Express: tub to shower conversion in master bathroom. replace the exhaust fan in the master bathroom · 355 m away
- 2004 Jesse E Segovia StJan 17, 2024Total demolition of sfr 1130 sq ft circa 1945 · 361 m away