504 Brushy St
Austin, TX 78702
Brushy Street site plan cases were aborted in 2024
City of Austin records list an approved site-plan case named North Door at 504 Brushy St., filed Aug. 7, 2018. Two later site-plan cases, including a revision, were marked aborted on Sept. 10, 2024; the records do not specify what is currently being built.
Summarized from City of Austin records · updated Sep 10, 2024
- Projects
- 3
- 3 filings
- Latest filing
- Sep 10, 2024
- since Aug 7, 2018
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Austin
Questions about 504 Brushy St
What is being built at 504 Brushy St. in Austin?
The available records do not identify a current project under construction. They show an approved 2018 site-plan case named North Door and two later site-plan cases marked aborted.
What happened to the 504 Brushy Street site plan?
The City of Austin marked the original case and its revision as aborted on Sept. 10, 2024. The records do not state why.
Was a project approved at 504 Brushy St.?
A City of Austin site-plan case named North Door was approved on Aug. 7, 2018. The records provided do not include its size or a description of the proposed work beyond the case name.
Is construction planned at 504 Brushy St. near 901 E 5th Street?
The records show two site-plan cases at 504 Brushy St. were marked aborted on Sept. 10, 2024. They do not establish whether another project is planned.
What are the permit numbers for 504 Brushy St.?
The City of Austin case IDs are 11702006 for the approved North Door site plan, and 12104845 and 12946167 for the original case and revision marked aborted on Sept. 10, 2024.
Also being built nearby
All of 78702- 501 N IH 35 Svrd NbAug 2, 2024Add new 240v circuit in kitchen for pizza maker · 19 m away
- 902 E 5th StOct 14, 2026Change of use to restaurant with remodel · 40 m away
- 809 6th StNov 17, 2026805 and 809 e 6th st · 42 m away
- 517 IH 35 SvrdJul 2, 2016Blessed · 49 m away
- 901 E 5th Street · Plaza Saltillo TodApr 30, 2026901 e 5th - phase 1 — renovation/alteration — b occupancy tenant improvement on floors: 02, 03 & 04. scope of work is limited to new interior non-structural partitions, ceilings, updated mechanical and electrical work. no structural work. no access control work · 51 m away
- 901 E. 6th Street, 4th · Clpf 901 East 6th LPJul 20, 2026Realtor.com — renovation/alteration — minor interior renovation / remodel · 68 m away
- 901 E 6th StAug 17, 2026Minot remodel of existing tenant space to demolition existing interior improvements relocate doors add 6 new electrical j box whips to new furniture and update access control from previous expired permit. no plumbing or mech scope · 69 m away
- 901 E 5th StOct 13, 2026Unit 100 (whole foods) replacing burned guts from another contractor in switchboard - emergency! ***not connected to any other eps at this address-hyatt · 71 m away
- 900 E 6th St · Building 2Jul 2, 2025Legacy padel — renovation/alteration — the project scope includes the partial demolition of an existing concrete tilt up panel warehouse building and interior renovation for an indoor sports facility. new outdoor courts for assembly recreational use are proposed · 80 m away
- 500 San Marcos StFeb 20, 2010Five east · 113 m away
- 500 N IH 35 Svrd SbJul 9, 2025Add accessible seating at existing bar replace lighting & finishes in meeting rooms replace lighting & finishes in dining room replace finishes & ffe in dining room bar and meeting rooms · 136 m away
- 725 E 6th StFeb 24, 2026Old sixth - new trash room - new door new floor drains new exhaust fans minor elec. work · 149 m away