54 Anthony St
Austin, TX 78702
Two-story single-family home with a Level 2 EV charger
City of Austin permit records describe a new two-story, three-bedroom, 3.5-bath single-family home at 54 Anthony St, with plumbing and mechanical permits dated May 26 and August 28, 2023. A separate permit to install a Level 2 EV charger was filed June 24, 2026, and is marked final.
Summarized from City of Austin records · updated Jun 24, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Jun 24, 2026
- since Jun 24, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2026-078871 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Expedited review - new construction of a 2-story single family res. [3bed 3.5bath]
Expedited review - new construction of a 2-story single family res. [3bed 3.5bath]
City of Austin permitMechanical PermitFinal- Record
- 2022-182391 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
***per coordination with 23-081402 ex work may only occur 07/31/23 - 08/15/23 - driveway*** construct new driveway approach of 12 ft. no sidewalk inspection per plan review. *rs
***per coordination with 23-081402 ex work may only occur 07/31/23 - 08/15/23 - driveway*** construct new driveway approach of 12 ft. no sidewalk inspection per plan review. *rs
City of Austin permitDriveway / SidewalksFinal- Record
- 2023-071017 DS
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Temp pole for 54 anthony st
Temp pole for 54 anthony st
City of Austin permitElectrical PermitFinal- Record
- 2023-057342 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Expedited review - new construction of a 2-story single family res. [3bed 3.5bath]
Expedited review - new construction of a 2-story single family res. [3bed 3.5bath]
City of Austin permitPlumbing PermitFinal- Record
- 2022-182391 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 54 Anthony St
What is being built at 54 Anthony St?
Austin permit records describe a new two-story, three-bedroom, 3.5-bath single-family home. The plumbing and mechanical permits are marked final.
When were permits filed for the home at 54 Anthony St?
The plumbing permit was dated May 26, 2023, and the mechanical permit was dated August 28, 2023. Both describe new construction of a two-story single-family residence.
Is a Level 2 EV charger being installed at 54 Anthony St?
A City of Austin electrical permit to install a Level 2 EV charger was filed June 24, 2026. The permit is marked final.
How many bedrooms and bathrooms will the home at 54 Anthony St have?
The permit description lists a three-bedroom, 3.5-bath single-family residence.
What is being built near Northwend Investors at 2115 Riverview Street?
About 157 meters away, permits for 54 Anthony St describe a two-story, three-bedroom, 3.5-bath single-family home. A separate 2026 permit covers a Level 2 EV charger.
Is 54 Anthony St a single-family home or a multi-unit building?
The permit descriptions identify new construction of a single-family residence, not a multi-unit building.
Also being built nearby
All of 78702- 2011 Holly StMay 20, 2025Express - install walk-in shower. replace all breakers in main panel only · 59 m away
- 2011 Haskell StApr 6, 2026Replacement of complete existing central heat and air system with or without duct work · 67 m away
- 2009 Haskell StApr 21, 2026Existing overhead electrical service will be upgrade · 73 m away
- 45 Anthony StNov 6, 2024Address: 45 anthony st. unit b addition and remodel to existing unit in duplex · 89 m away
- 2005 Haskell StMar 4, 2024Running gas line for generator install · 94 m away
- 2104 Holly StMar 11, 2024Express: replace windows and doors like for like plumbing electrical hvac work shower/tub conversions (not relocating plumbing or walls) · 109 m away
- 2109 Haskell StOct 10, 2026Eplan: residential expedited review - addition and remodel to existing 1-story single family res. [2bed 2bath] work to include: first floor addition interior remodel new half bath [2bed 2.5bath] · 110 m away
- 2002 Holly StMay 1, 2026Replacement of an existing water heater swapping out old gas tankless water heater for a similar model · 123 m away
- 40 Anthony StDec 17, 2024Amnesty co · 128 m away
- 2010 Riverview StJul 21, 2025Demolition and haul existing decks including framing & railings. 400 sq ft & 97 sq ft cedar terraces on ground contact treated wood frame attached to existing flat roof. two 312 sq ft cedar decks on ground contact treated wood frame. 1st floor deck secured to foundation below. rough sawn cedar posts to support 2nd floor deck.black steel railing with cedar drink rail new stair to replace existing from 1st deck to grade. remove all existing roofing material. re-roof flat and sloped roofs. new drip edge and synthetic felt.underlayment · 130 m away
- 2100 Riverview StMay 19, 2025Express: replace tub to shower replace hvac system replace kitchen outlets gfics · 130 m away
- 66 Anthony StNov 2, 2026New pool building 2 · 131 m away