739 Cherico St
Austin, TX 78702
In-ground pool and spa permitted at 739 Cherico St
City of Austin permits show an in-ground gunite pool and spa at 739 Cherico St. The building permit was filed April 4, 2025, followed by electrical and plumbing permits filed May 6 and June 6, 2025; all three are marked final.
Summarized from City of Austin records · updated Jun 6, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Jun 6, 2025
- since Apr 4, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledIn ground gunite pool and spa
- AppliedMar 12, 2025
- IssuedJun 6, 2025
- WorkJun '25 – Jul '25
- Final inspectionJul 11, 2025
Passed final inspection Jul 11, 2025.
1 contact on this project · 1 phone number
Permit & project history
3 projectsIn ground gunite pool and spa
In ground gunite pool and spa
City of Austin permitPlumbing PermitFinal- Record
- 2025-038979 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
In ground gunite pool and spa
In ground gunite pool and spa
City of Austin permitElectrical PermitFinal- Record
- 2025-038979 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
In ground gunite pool and spa
In ground gunite pool and spa
City of Austin permitBuilding PermitFinal- Record
- 2025-038979 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 739 Cherico St
What is being built at 739 Cherico St in Austin?
City of Austin permits describe an in-ground gunite pool and spa at the address.
When were the permits for the pool at 739 Cherico St filed?
The building permit was filed April 4, 2025. Electrical and plumbing permits followed on May 6 and June 6, 2025.
What are the permit numbers for 739 Cherico St?
The permits are 2025-038979 BP for building, 2025-038979 EP for electrical, and 2025-038979 PP for plumbing.
Are the 739 Cherico St pool permits final?
Yes. The City of Austin lists all three permits—building, electrical, and plumbing—as final.
Is a retail space being built at 739 Cherico St?
The available permit descriptions specify an in-ground gunite pool and spa. They do not describe retail construction.
Also being built nearby
All of 78702- 741 Cherico StAug 14, 2025Replacement of an existing water heater replace tankless water heater with another tankless water heater · 17 m away
- 738 Gunter StSep 22, 2026All interior remodel with new roof. no addition to the footprint or increase in house square footage. however a new roof will be added due to tree damage and itll increase the height of the structure from 14-4.5 to 15-8 · 61 m away
- 3412 Gonzales StOct 21, 2025Install irrigation system · 69 m away
- 722 Gunter StOct 21, 2025Irrigation sistem installation · 75 m away
- 746 Gunter StOct 5, 2026Express - replacing siding and windows (all existing window openings and structural framing will remain unchanged) · 76 m away
- 3405 Gonzales StDec 10, 2025Construct new driveway approach of 10 ft · 96 m away
- 3409 Gonzales StDec 15, 2025Construct new driveway approach of 12 ft · 96 m away
- 3401 Gonzales StMay 19, 2025Express: tub to shower conversion · 99 m away
- 3413 Gonzales StFeb 16, 2026300 sq ft inground pool with autofill · 101 m away
- 745 Gunter StAug 17, 2026Installation of tesla powershare bidirectional v2h (vehicle-to-home) charging system. per guidance from stuart prior at ae we need to submit this interconnection application with inspection from ae under an aux power electrical permit because the hardware involves a ul 1741 grid-interactive device. ae wants to test the v2h functionality at final inspection to ensure effective isolation from the grid. tesla gateway 3v to be powered by 125a breaker placed in existing main electric panel. tesla gateway 3v to be installed inside attached garage on interior wall behind existing meter and main electric panel. tesla universal wall connector (ev charger) to be hardwired to a 60a breaker placed inside tesla gateway 3v. ev charger to be mounted inside garage on interior back wall. designated backed-up loads for v2h during grid outage: 60a circuit feeding the subpanel and 30a circuit feeding the smaller furnace. ac unit larger furnace and dryer will be the non-backed-up loads · 105 m away
- 3504 Gonzales StAug 18, 2026Emergency gas meter relocation away from combustible area. while tx gas makes leak repairs on their main so when they hook the meter back up it will be in compliance · 117 m away
- 800 Gunter StDec 18, 2023Replacement of furnace only · 135 m away