groundranger
Recent · latest filing Jan 2026Residential

88 Chalmers Ave

Austin, TX 78702

HVAC replacement and EV charging circuit permitted at 88 Chalmers

Permits at 88 Chalmers Ave cover replacement of the existing central heating and air system and installation of an electrical circuit for EV charging. The electrical permit was filed September 26, 2025, and the mechanical permit was filed January 29, 2026; both are marked final.

Summarized from City of Austin records · updated Jan 29, 2026

Projects
2
2 filings
Latest filing
Jan 29, 2026
since Sep 26, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work gillian cooper

  1. AppliedJan 21, 2026
  2. IssuedJan 29, 2026
  3. WorkJan '26 – Mar '26
  4. Final inspectionMar 10, 2026

Passed final inspection Mar 10, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Replacement of complete existing central heat and air system with or without duct work gillian cooper

    Replacement of complete existing central heat and air system with or without duct work gillian cooper

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installing circuit for ev charging

    Installing circuit for ev charging

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 88 Chalmers Ave

What is being built at 88 Chalmers Ave?

The permits describe home upgrades: an electrical circuit for EV charging and replacement of the existing central heat and air system. They do not describe a new building.

Is a new home being built at 88 Chalmers Ave?

The two listed permits are for electrical and mechanical work, not new construction.

Is an EV charger being installed at 88 Chalmers Ave?

A City of Austin electrical permit describes installing a circuit for EV charging. The permit, 2025-119891 EP, was filed September 26, 2025, and is marked final.

What HVAC work is permitted at 88 Chalmers Ave?

A City of Austin mechanical permit covers replacement of the complete existing central heat and air system, with or without duct work. Permit 2026-007448 MP was filed January 29, 2026, and is marked final.

When were the permits filed for 88 Chalmers Ave?

The electrical permit was filed September 26, 2025, and the mechanical permit was filed January 29, 2026. Both are marked final.

What are the permit numbers for 88 Chalmers Ave?

The electrical permit for an EV-charging circuit is 2025-119891 EP. The mechanical permit for central heating and air replacement is 2026-007448 MP.

Also being built nearby

All of 78702
Email me when a new permit is filed