905 Tillery St
Austin, TX 78702
Subdivision applications at 905 Tillery are inactive
City of Austin records show subdivision applications covering 901.5 and 905 Tillery, not a building permit for new construction. The first case was filed June 24, 2024, and withdrawn; a related case filed January 30, 2025, is marked expired.
Summarized from City of Austin records · updated Jan 30, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jan 30, 2025
- since Jun 24, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 905 Tillery St
What is being built at 905 Tillery St in Austin?
The records show subdivision applications for 901.5 and 905 Tillery, not a building project. The June 24, 2024 case was withdrawn, and the January 30, 2025 case is marked expired.
Is there an active development application for 905 Tillery?
The available City of Austin records list two subdivision cases, both inactive: case 13224928 is withdrawn and case 13348218 is expired.
When was the subdivision case for 905 Tillery filed?
The first listed case, 13224928, was filed June 24, 2024. A related case, 13348218, was filed January 30, 2025.
Does 905 Tillery have a building permit?
The records provided show subdivision cases, not a building permit. They do not specify plans for construction at the address.
What does the 905 Tillery subdivision application cover?
The case names describe a resubdivision of Delzell Subdivision No. 2 at 901.5 and 905 Tillery. The available records do not give further details about the proposed subdivision.
Was the 905 Tillery subdivision application approved?
The records do not show an approved case. The June 24, 2024 application was withdrawn, and the January 30, 2025 case is marked expired.
Also being built nearby
All of 78702- 901-1/2 Tillery StOct 13, 2023901.5 & 905 tillery st, a resubdivision of delzell subdivision no. 2 · 20 m away
- 919 Tillery StOct 6, 2026Eplan: residential expedited review - new construction of a 3-story single family res. [4bed 3.5bath] with attached carport. building 1 · 24 m away
- 917 Tillery StOct 6, 2026Eplan: residential expedited review - new construction of a 3-story single family res. [3bed 3.5bath] with attached carport. building 3 · 26 m away
- 3202 Lyons RdOct 23, 2025Vargas - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 200 main breaker mpu and full service upgrade upgrading revenue meter to 200 amps only · 28 m away
- 913 Tillery StOct 29, 2026Demolition old driveway. construct new driveway approach of 20 ft · 29 m away
- 910 Tillery StNov 18, 2025New pool with required enclosure (pool #1 main residence) · 38 m away
- 3204 Lyons RdMar 18, 2026Construct new driveway approach of 21 ft and sidewalk of 19 lf · 38 m away
- 908 Tillery StApr 22, 2025Express - redo kitchen cabinets counter bathroom cabinets shower tile floors interior paint exterior paint roof · 40 m away
- 911 Tillery StMay 30, 2018911 tillery subdivision · 57 m away
- 1006 Tillery StFeb 7, 2024Construct new driveway approach of 18 ft and sidewalk of 10lf and curb & gutter of 16 ft · 69 m away
- 1008 Tillery StSep 4, 2026Base: installing a backup battery system and additional meter socket · 71 m away
- 1003 Tillery StApr 28, 2026Replat of lot 2, the rogers estate (with r c8-2024-0123.0a) · 100 m away