912 E 2nd St
Austin, TX 78702
912 E 2nd St: 1 project on record
City of Austin lists 1 filing across 1 project at 912 E 2nd St, Austin, TX 78702. The most recent, filed November 19, 2024, covers: “Gast test & repair-repipe gas system from meter to water heater to gas stove”.
Compiled from City of Austin records · updated Nov 19, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 19, 2024
- since Nov 19, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectGast test & repair-repipe gas system from meter to water heater to gas stove
Gast test & repair-repipe gas system from meter to water heater to gas stove
City of Austin permitPlumbing PermitFinal- Record
- 2024-150163 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 912 E 2nd St
What is being built at 912 E 2nd St?
The latest filing (City of Austin permit 2024-150163 PP, November 19, 2024) covers gast test & repair-repipe gas system from meter to water heater to gas stove.
How many permits and filings does 912 E 2nd St have?
1 filing across 1 project, from November 19, 2024 to November 19, 2024.
What is being built near Above The Mucky-Muck in Austin?
912 E 2nd St is about 136 m from Above The Mucky-Muck (1006 E Cesar Chavez St). Its latest filing is for gast test & repair-repipe gas system from meter to water heater to gas stove.
Is there other construction near 912 E 2nd St?
Yes. Nearby filings include 208 San Marcos St (interior remodel - kitchen remodel and bathroom remodel: see additional page, Sep 15, 2026); 909 E 2nd St (.ran camera down left side of home encountered three major bellies two disconnected main lines because of a combination of cast-iron and pvc house was built in the 50s or 60s in order to accomplish this repair we must trench from the clean out to the city tap going towards the backyard in a straight line about 100 feet then going underneath the home. we need to do a 7 foot tunnel even though the home is on pure and beam where the cleanout is is underground and then pops up to the first downstairs bathroom we need to expose that bathroom shower sink and toilet and re-pipe those branch lines to the main line, Jul 9, 2026); 1013 E 3rd St (gas test to restore service repair the clearance around the flue pipe, Dec 11, 2025).
How do I get alerts for new permits at 912 E 2nd St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78702- 208 San Marcos StSep 15, 2026Interior remodel - kitchen remodel and bathroom remodel: see additional page · 44 m away
- 909 E 2nd StJul 9, 2026.ran camera down left side of home encountered three major bellies two disconnected main lines because of a combination of cast-iron and pvc house was built in the 50s or 60s in order to accomplish this repair we must trench from the clean out to the city tap going towards the backyard in a straight line about 100 feet then going underneath the home. we need to do a 7 foot tunnel even though the home is on pure and beam where the cleanout is is underground and then pops up to the first downstairs bathroom we need to expose that bathroom shower sink and toilet and re-pipe those branch lines to the main line · 62 m away
- 1013 E 3rd StDec 11, 2025Gas test to restore service repair the clearance around the flue pipe · 74 m away
- 105 San Marcos StNov 4, 2024New portable building installation of classroom for religious assembly · 80 m away
- 112 MedinaMay 29, 2025Roughly 45 of sewer line replacement toward city tap · 94 m away
- 107 Brushy StMay 15, 2026Gas test for 107 brushy st. 78702 · 102 m away
- 908 Cesar Chavez StNov 10, 2026Austin baptist chapel · 109 m away
- 1000 Cesar Chavez StMar 2, 20071000 east site improvements · 112 m away
- 205 MedinaNov 5, 2026Construct new driveway approach of 12 ft · 134 m away
- 1006 E Cesar Chavez St · Above The Mucky-Muck LLCOct 5, 20261006 e cesar chavez office remodel — renovation/alteration — work includes reconfiguration of interior partitions to provide reception, private offices, a conference room, storage, and restroom improvements; associated door, finish, ceiling, lighting, mechanical, electrical, and plumbing work · 136 m away
- 1100 E 2nd StSep 2, 2025Capoff for water and wastewater for total demolition of duplex 1440 sq ft circa 1900 · 138 m away
- 1010 East Cesar Chavez · Urth CaffeApr 28, 2025Urth caffe restaurant — renovation/alteration — project consists of building renovation to interior of existing restaurant structure and wood framed addition to existing restaurant structure · 141 m away