908 Cesar Chavez St
Austin, TX 78702
Austin Baptist Chapel site plan pending at 908 Cesar Chavez
A site plan for Austin Baptist Chapel at 908 Cesar Chavez St was filed with the City of Austin on November 10, 2026, and is pending. The records do not specify the proposed project’s size or construction schedule.
Summarized from City of Austin records · updated Nov 17, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Nov 17, 2026
- since Nov 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 908 Cesar Chavez St
What is being built at 908 Cesar Chavez St?
A City of Austin case names Austin Baptist Chapel and describes a site plan. The case, number 13798394, was filed November 10, 2026, and is marked “CC Pending.”
Is a new church being built at 908 Cesar Chavez?
The city record is for a pending site plan for Austin Baptist Chapel, but it does not confirm that construction has started or provide construction details.
Has the Austin Baptist Chapel site plan been approved?
The November 10, 2026, case is marked “CC Pending,” not approved. A separate site plan for Austin Baptist Church was approved and released on March 2, 2007.
When was the latest permit filed for 908 Cesar Chavez St?
The latest record is a City of Austin site-plan case filed November 10, 2026. It is listed as pending rather than as an issued building permit.
What is being remodeled near 908 Cesar Chavez St?
A nearby record at 1006 E Cesar Chavez St describes an office remodel with interior partition changes and improvements to several building systems. That work is a separate project from the chapel site-plan case.
Also being built nearby
All of 78702- 1000 Cesar Chavez StMar 2, 20071000 east site improvements · 46 m away
- 909 E 2nd StJul 9, 2026.ran camera down left side of home encountered three major bellies two disconnected main lines because of a combination of cast-iron and pvc house was built in the 50s or 60s in order to accomplish this repair we must trench from the clean out to the city tap going towards the backyard in a straight line about 100 feet then going underneath the home. we need to do a 7 foot tunnel even though the home is on pure and beam where the cleanout is is underground and then pops up to the first downstairs bathroom we need to expose that bathroom shower sink and toilet and re-pipe those branch lines to the main line · 48 m away
- 1010 East Cesar Chavez · Urth CaffeApr 28, 2025Urth caffe restaurant — renovation/alteration — project consists of building renovation to interior of existing restaurant structure and wood framed addition to existing restaurant structure · 56 m away
- 105 San Marcos StNov 4, 2024New portable building installation of classroom for religious assembly · 57 m away
- 909 Cesar Chavez StMar 2, 2007909 e. cesar chavez street · 60 m away
- 909 E Cesar Chavez StAug 14, 2026Replacement of complete existing central heat and air system with or without duct work change out · 60 m away
- 107 Brushy StMay 15, 2026Gas test for 107 brushy st. 78702 · 64 m away
- 1006 E Cesar Chavez St · Above The Mucky-Muck LLCOct 5, 20261006 e cesar chavez office remodel — renovation/alteration — work includes reconfiguration of interior partitions to provide reception, private offices, a conference room, storage, and restroom improvements; associated door, finish, ceiling, lighting, mechanical, electrical, and plumbing work · 69 m away
- 112 MedinaMay 29, 2025Roughly 45 of sewer line replacement toward city tap · 103 m away
- 906 Willow StFeb 6, 2024Replacement of any self-contained packaged units · 109 m away
- 912 E 2nd StNov 19, 2024Gast test & repair-repipe gas system from meter to water heater to gas stove · 109 m away
- 104 MedinaSep 8, 2026Interior remodel to existing 2 story structure. [7 day review] · 117 m away