1014 Shelley Ave
Austin, TX 78703
1014 Shelley Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 1014 Shelley Ave, Austin, TX 78703. The most recent, filed July 9, 2024, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Jul 9, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 9, 2024
- since Jul 9, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedJul 4, 2024
- IssuedJul 9, 2024
- WorkJul '24 – Aug '24
- Final inspectionAug 21, 2024
Passed final inspection Aug 21, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-083385 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1014 Shelley Ave
What is being built at 1014 Shelley Ave?
The latest filing (City of Austin permit 2024-083385 PP, July 9, 2024) covers replacement of an existing water heater.
How many permits and filings does 1014 Shelley Ave have?
1 filing across 1 project, from July 9, 2024 to July 9, 2024.
What is being built near West Austin Park in Austin?
1014 Shelley Ave is about 26 m from West Austin Park (1317 W 10th St). Its latest filing is for replacement of an existing water heater.
Is there other construction near 1014 Shelley Ave?
Yes. Nearby filings include 1317 W 10th St (lbl west austin park water quality retrofit — renovation/alteration — biofiltration basin retrofit, park improvements, and wastewater line improvements. limit of construction are approximately 2.5 acres, Apr 7, 2026); 1317 West 10th Street (the overlook project — new construction — the scope of work includes the renovation and improvements to 14,520sf in the northwest corner of the west austin neighborhood park. included will be seating areas, landscaping and irrigation and, Oct 8, 2024); 1003 Shelley Ave (replacement of complete existing central heat and air system with or without duct work install new best horizontal furnace 4 ton ac bundle, Aug 18, 2025).
How do I get alerts for new permits at 1014 Shelley Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78703- 1317 W 10th St · West Austin ParkApr 7, 2026Lbl west austin park water quality retrofit — renovation/alteration — biofiltration basin retrofit, park improvements, and wastewater line improvements. limit of construction are approximately 2.5 acres · 26 m away
- 1317 West 10th Street · City Of Austin Parks And Recreation DepartmentOct 8, 2024The overlook project — new construction — the scope of work includes the renovation and improvements to 14,520sf in the northwest corner of the west austin neighborhood park. included will be seating areas, landscaping and irrigation and · 26 m away
- 1003 Shelley AveAug 18, 2025Replacement of complete existing central heat and air system with or without duct work install new best horizontal furnace 4 ton ac bundle · 32 m away
- 1004 Shelley AveAug 25, 2025Replacement of an existing water heater 1004 shelley · 38 m away
- 1303 W 10th StNov 15, 2023Replacement of complete existing central heat and air system with or without duct work · 50 m away
- 1009 Shelley AveOct 23, 2026Replacement of complete existing central heat and air system with or without duct work like for like 2 ton vertical heat pump · 67 m away
- 1001 Lorrain StMay 19, 2026Removing the old gas tank style water heater to install a gas tankless water heater · 72 m away
- 1005 Lorrain StMar 28, 2024Add 17kwh energy storage system to existing solar panel system · 76 m away
- 1011 Shelley AveDec 5, 2025Replacement of complete existing central heat and air system with or without duct work upstairs system located in closet on 2nd floor · 84 m away
- 1009 Lorrain StMar 2, 2007Martin house pre-school · 91 m away
- 1012 Shelley AveDec 14, 2023Irrigation for lawn · 92 m away
- 1310 W 9th Half StDec 9, 2025Express: foundation repair - installing 10 and 12 sono piers · 92 m away