1626 Palma Plz
Austin, TX 78703
Permits cover three central heating and air replacements
City of Austin records show three permits to replace the existing central heating and air system at 1626 Palma Plz. The permits were filed June 29, 2025, September 24, 2026, and November 3, 2026, and each is marked final.
Summarized from City of Austin records · updated Nov 3, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Nov 3, 2026
- since Jun 29, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work k strnad
- AppliedOct 19, 2026
- IssuedNov 3, 2026
- WorkNov '26 – Nov '26
- Final inspectionNov 6, 2026
Passed final inspection Nov 6, 2026.
1 contact on this project · 1 phone number
Permit & project history
4 projectsReplacement of complete existing central heat and air system with or without duct work k strnad
Replacement of complete existing central heat and air system with or without duct work k strnad
City of Austin permitMechanical PermitFinal- Record
- 2026-137594 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-123880 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-074279 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2023-018507 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1626 Palma Plz
What is happening at 1626 Palma Plz?
City of Austin permits indicate replacement of the existing central heating and air system. Three mechanical permits were filed between June 2025 and November 2026.
Is new construction planned at 1626 Palma Plz?
The records provided show mechanical permits for replacing an existing central heating and air system, not a new construction project.
When were the HVAC permits filed for 1626 Palma Plz?
The permits were filed June 29, 2025, September 24, 2026, and November 3, 2026.
What does permit 2026-137594 MP cover?
The November 3, 2026, City of Austin mechanical permit covers replacement of the complete existing central heating and air system, with or without duct work. Its status is final.
Are the permits for 1626 Palma Plz final?
Yes. All three City of Austin mechanical permits in the records are marked final: 2025-074279 MP, 2026-123880 MP, and 2026-137594 MP.
Also being built nearby
All of 78703- 1618 Palma PlzSep 12, 2025Palma plaza · 37 m away
- 1403 Woodlawn BlvdApr 8, 2025Express: install new windows (like for like) · 43 m away
- 1621 Enfield RdMar 17, 2026Diagnostic revealed a leak on the tub drain for unit c and a belly on the main drain under unit c bathroom. - plan of action is to apply for a permit with the customers jurisdiction to legally and professionally proceed with repairs. - begin by excavating the entry hole at the back of the building outside of unit c. - then tunnel underneath the foundation of the building approximately 10 feet to access and expose noted diagnostic issues. - if additional tunneling or beam penetration is needed a supplemented estimate will be provided. - if any more work is needed such as solid rock removal roots or any unforeseeable objects come across this estimate will be supplemented to accommodate the additional work needed to complete the job. - defective drains will be removed from the plumbing system and debris will be hauled away. - drains will then be replaced with new dwv schedule 40 pvc pipe and fittings in accordance with plumbing code. - pipe will be well supported and strapped to underneath foundation to prevent the same thing happening in the future. - after work is completed we will then perform a static test on the entire drain system to ensure there are no further leaks. if additional leaks are found a separate estimate will be presented for the repair · 53 m away
- 1629 Palma PlzJun 16, 2025Express - 14 - imperia windows. replace like for like · 67 m away
- 1621 W 14th StAug 21, 2025Install a temporary pole power 100 a at 1621 w. 14th st. austin tx ***ref:2024-133104 bp · 76 m away
- 1309 Woodlawn BlvdDec 11, 2009Woodlawn townhomes (withdraw & resubmit of sp-2007-0714c) · 98 m away
- 1410 Woodlawn BlvdJun 24, 2015Woodlawn terrace · 107 m away
- 1301 Woodlawn BlvdMar 12, 2024Total demolition of pool circa 2018 (tree review fee not charged due to concurrent new construction submission) · 116 m away
- 1508 Pease RdOct 23, 2026Total demolition of garage apartment 1700 sq ft circa 1947 · 116 m away
- 1510 Pease RdDec 16, 2025New pool · 118 m away
- 1512 Pease RdJan 23, 2024Repair sewer yard line · 120 m away
- 1507 Pease RdAug 3, 2026Replacement of an existing water heater& install gas sediment trap/drip leg · 123 m away