1803 Stamford Ln
Austin, TX 78703
1803 Stamford Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 1803 Stamford Ln, Austin, TX 78703. The most recent, filed June 19, 2024, covers: “Replacement of mini-split system”.
Compiled from City of Austin records · updated Jun 19, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 19, 2024
- since Jun 19, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of mini-split system
- AppliedJun 12, 2024
- IssuedJun 19, 2024
- !WorkJun '24 – Aug '25
- Final inspection
Marked expired Aug 11, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of mini-split system
Replacement of mini-split system
City of Austin permitMechanical PermitExpired- Record
- 2024-074157 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1803 Stamford Ln
What is being built at 1803 Stamford Ln?
The latest filing (City of Austin permit 2024-074157 MP, June 19, 2024) covers replacement of mini-split system.
How many permits and filings does 1803 Stamford Ln have?
1 filing across 1 project, from June 19, 2024 to June 19, 2024.
Is there other construction near 1803 Stamford Ln?
Yes. Nearby filings include 1805 Stamford Ln (10 tunnel below the foundation to correct bellied section of master bath shower drain line. 1 access hole - left side near gate, Mar 27, 2025); 1801 Stamford Ln (replacement of complete existing central heat and air system with or without duct work hvac change out: 3 ton horizontal gas system hvac change out: 2 ton horizontal gas system **two system change out, Aug 8, 2025); 1806 Forest Trl (replacement of furnace only 2.0 ton with gas furnace economy replacement, Jan 16, 2026).
How do I get alerts for new permits at 1803 Stamford Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78703- 1805 Stamford LnMar 27, 202510 tunnel below the foundation to correct bellied section of master bath shower drain line. 1 access hole - left side near gate · 19 m away
- 1801 Stamford LnAug 8, 2025Replacement of complete existing central heat and air system with or without duct work hvac change out: 3 ton horizontal gas system hvac change out: 2 ton horizontal gas system **two system change out · 20 m away
- 1806 Forest TrlJan 16, 2026Replacement of furnace only 2.0 ton with gas furnace economy replacement · 44 m away
- 1900 Forest TrlAug 5, 2026New pool and spa accessory to single family residence · 73 m away
- 1903 Stamford LnMay 22, 2024Replacement of an existing water heater · 75 m away
- 1802 Stamford LnNov 22, 2023Gas piping for generator · 77 m away
- 1902 Forest TrlMay 20, 2026New construction of pool and spa. 1 for 1 replacement of existing pool · 84 m away
- 1701 Stamford LnJan 14, 2025New residential pool and aquatic plant pond · 88 m away
- 1700 Stamford LnMar 27, 2025Emergency gas meter relocation. the gas line has heavy corrosion and theyre concerned about a possible future leak. we are relocating the gas meter away from combustion and any open doorways and windows · 94 m away
- 1806 Stamford LnSep 26, 2026Gas test gas was turn off and customer need gas test · 95 m away
- 2000 Forest TrlNov 24, 2025New pool autofill only · 102 m away
- 1902 Stamford LnApr 25, 2024New construction in-ground pool · 111 m away