1900 Vista Ln
Austin, TX 78703
1900 Vista Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 1900 Vista Ln, Austin, TX 78703. The most recent, filed June 27, 2024, covers: “Replace sewer yard line from house connection to city tap”.
Compiled from City of Austin records · updated Jun 27, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 27, 2024
- since Jun 27, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace sewer yard line from house connection to city tap
- AppliedJun 27, 2024
- IssuedJun 27, 2024
- WorkJun '24 – Nov '24
- Final inspectionNov 8, 2024
Passed final inspection Nov 8, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace sewer yard line from house connection to city tap
Replace sewer yard line from house connection to city tap
City of Austin permitPlumbing PermitFinal- Record
- 2024-080558 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1900 Vista Ln
What is being built at 1900 Vista Ln?
The latest filing (City of Austin permit 2024-080558 PP, June 27, 2024) covers replace sewer yard line from house connection to city tap.
How many permits and filings does 1900 Vista Ln have?
1 filing across 1 project, from June 27, 2024 to June 27, 2024.
Is there other construction near 1900 Vista Ln?
Yes. Nearby filings include 1901 Vista Ln (express - replacing garage doors in existing openings installing new shutters replacing front door and expanding door opening size landscaping adding portico over front door adding gas laterns by front door, Nov 10, 2026); 1901 Elton Ln (replacement of complete existing central heat and air system with or without duct work, Jul 26, 2024); 1903 Elton Ln (replacement of complete existing central heat and air system with or without duct work like for like: 5 ton horizontal gas system (downstairs), Oct 31, 2025).
How do I get alerts for new permits at 1900 Vista Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78703- 1901 Vista LnNov 10, 2026Express - replacing garage doors in existing openings installing new shutters replacing front door and expanding door opening size landscaping adding portico over front door adding gas laterns by front door · 49 m away
- 1901 Elton LnJul 26, 2024Replacement of complete existing central heat and air system with or without duct work · 50 m away
- 1903 Elton LnOct 31, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton horizontal gas system (downstairs) · 53 m away
- 1903 Vista LnJun 23, 2026Total demolition of sfr 2271 sq ft circa 1947 · 57 m away
- 1807 Vista LnOct 13, 2026New irrigation system · 59 m away
- 1805 Vista LnApr 6, 2026Replacement of complete existing central heat and air system with or without duct work 2.5 ton horizontal gas system (upstairs). replaced 2 ton horizontal gas system - downstairs · 65 m away
- 1907 Elton LnMar 21, 2024Replace the existing equipment with a carrier 4-ton air conditioning system with gas heat · 68 m away
- 2000 Vista LnJun 10, 2025Express - conversion tub / shower to standing shower - install new flooring and vanity · 78 m away
- 2001 Elton LnNov 1, 2024Replacement of complete existing central heat and air system with or without duct work · 83 m away
- 1801 Vista LnAug 5, 2026New irrigation system install for unit a on property · 84 m away
- 1710 Vista LnMay 12, 202648 amp car charger with 60a overcurrent protection · 88 m away
- 1707 Elton LnJul 16, 2026Replacement of an existing water heater provision and installation of a high-efficiency navien npe-240a2 natural gas tankless water heater · 101 m away