groundranger
Historic · latest filing Apr 2025Residential

2003 Hopi Trl

Austin, TX 78703

2003 Hopi Trl: 2 projects on record

City of Austin lists 2 filings across 2 projects at 2003 Hopi Trl, Austin, TX 78703 since April 15, 2025. The most recent, filed April 24, 2025, covers: “Replace 100 of galvanized water line from meter to house install outdoor tankless water heater run ~ 30 gas”.

Compiled from City of Austin records · updated Apr 24, 2025

Projects
2
2 filings
Latest filing
Apr 24, 2025
since Apr 15, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replace 100 of galvanized water line from meter to house install outdoor tankless water heater run ~ 30 gas

  1. AppliedApr 21, 2025
  2. IssuedApr 24, 2025
  3. WorkApr '25 – Apr '25
  4. Final inspectionApr 30, 2025

Passed final inspection Apr 30, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Replace 100 of galvanized water line from meter to house install outdoor tankless water heater run ~ 30 gas

    Replace 100 of galvanized water line from meter to house install outdoor tankless water heater run ~ 30 gas

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Relocate the interior sub panel to new spot by code to allow use af/gfi breakers install ceiling fan and replace the old ones change receptacles and switches install recessed lights

    Relocate the interior sub panel to new spot by code to allow use af/gfi breakers install ceiling fan and replace the old ones change receptacles and switches install recessed lights

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2003 Hopi Trl

What is being built at 2003 Hopi Trl?

The latest filing (City of Austin permit 2025-048365 PP, April 24, 2025) covers replace 100 of galvanized water line from meter to house install outdoor tankless water heater run ~ 30 gas.

How many permits and filings does 2003 Hopi Trl have?

2 filings across 2 projects, from April 15, 2025 to April 24, 2025.

Is there other construction near 2003 Hopi Trl?

Yes. Nearby filings include 2005 Hopi Trl (gas test revised 12/13/24 sm - shutoff added to hvac in the attic, Dec 12, 2024); 2100 Hopi Trl (replacement of an existing water heater change out: install/ replace 18kw electric tankless water heater, Sep 12, 2025); 1906 Hopi Trl (replacement of complete existing central heat and air system with or without duct work located in attic, Oct 1, 2025).

How do I get alerts for new permits at 2003 Hopi Trl?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78703
Email me when a new permit is filed