2007 Griswold Ln
Austin, TX 78703
2007 Griswold Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 2007 Griswold Ln, Austin, TX 78703. The most recent, filed May 9, 2025, covers: “Replace sewer yard line from house connection to city tap”.
Compiled from City of Austin records · updated May 9, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 9, 2025
- since May 9, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace sewer yard line from house connection to city tap
- AppliedApr 30, 2025
- IssuedMay 9, 2025
- WorkMay '25 – May '25
- Final inspectionMay 15, 2025
Passed final inspection May 15, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace sewer yard line from house connection to city tap
Replace sewer yard line from house connection to city tap
City of Austin permitPlumbing PermitFinal- Record
- 2025-053825 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2007 Griswold Ln
What is being built at 2007 Griswold Ln?
The latest filing (City of Austin permit 2025-053825 PP, May 9, 2025) covers replace sewer yard line from house connection to city tap.
How many permits and filings does 2007 Griswold Ln have?
1 filing across 1 project, from May 9, 2025 to May 9, 2025.
Is there other construction near 2007 Griswold Ln?
Yes. Nearby filings include 2005 Griswold Ln (replace sewer yard line from house connection to city tap, May 9, 2025); 1807 Sharon Ln (upgrade main electrical service to 200 amps 120/240 volts, Aug 19, 2025); 2006 Griswold Ln (replace sewer yard line from house connection to city tap, Oct 11, 2024).
How do I get alerts for new permits at 2007 Griswold Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78703- 2005 Griswold LnMay 9, 2025Replace sewer yard line from house connection to city tap · 24 m away
- 1807 Sharon LnAug 19, 2025Upgrade main electrical service to 200 amps 120/240 volts · 33 m away
- 2006 Griswold LnOct 11, 2024Replace sewer yard line from house connection to city tap · 48 m away
- 2004 Griswold LnOct 13, 2026Total demolition of sfr 1544 sq ft circa 1953. ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 54 m away
- 1705 Sharon LnOct 26, 2026Generator gas line · 70 m away
- 1905 Sharon LnSep 17, 2026New pool · 77 m away
- 1704 Winsted LnJan 8, 2026We are looking to upgrade main electrical panel and also increase service size to 200a (currenty 125a) · 88 m away
- 1701 Sharon LnOct 14, 2026Install 26kw kohler generator with a 200ats · 90 m away
- 1907 Sharon LnFeb 7, 2025Replace sewer yard line from house connection to city tap · 94 m away
- 2105 Griswold LnDec 4, 2025Replace basin for lift station after riteway has dug pit · 104 m away
- 1803 Winsted LnJun 1, 2026Replacement of complete existing central heat and air system with or without duct work · 106 m away
- 1805 Winsted LnAug 28, 2025Whole home repipe as well as drain repipe under a pier and beam home · 106 m away