Sewer pipe replacement permitted at 2102 W 11th St
A City of Austin plumbing permit filed December 29, 2025, covers replacement of the existing subfloor cast-iron sewer pipe and its connection to existing risers. The permit record shows a final status and describes plumbing work, not new construction.
Summarized from City of Austin records · updated Dec 29, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 29, 2025
- since Dec 29, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of all existing subfloor cast iron sewer pipe and connecting to existing subfloor cast iron sewer risers using heavy duty adjustable rubber and stainless steel couplings
- AppliedDec 26, 2025
- IssuedDec 29, 2025
- WorkDec '25 – Jan '26
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of all existing subfloor cast iron sewer pipe and connecting to existing subfloor cast iron sewer risers using heavy duty adjustable rubber and stainless steel couplings
Replacement of all existing subfloor cast iron sewer pipe and connecting to existing subfloor cast iron sewer risers using heavy duty adjustable rubber and stainless steel couplings
City of Austin permitPlumbing PermitFinal- Record
- 2025-162271 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2102 W 11th St
What is happening at 2102 W 11th St in Austin?
A City of Austin permit covers replacement of the existing subfloor cast-iron sewer pipe and its connection to existing risers. It was filed December 29, 2025, under permit 2025-162271 PP.
Is a new home being built at 2102 W 11th St?
The available permit record describes sewer pipe replacement, not construction of a new home.
What kind of permit was issued for 2102 W 11th St?
The City of Austin record lists a plumbing permit, number 2025-162271 PP, with a final status.
When was the sewer work permitted at 2102 W 11th St?
The permit was filed on December 29, 2025.
What plumbing work is planned at 2102 W 11th St?
The permit describes replacing all existing subfloor cast-iron sewer pipe and connecting it to existing subfloor cast-iron sewer risers with heavy-duty adjustable rubber and stainless-steel couplings.
Also being built nearby
All of 78703- 2103 W 12th StMay 21, 2024Replacement of complete existing central heat and air system with or without duct work · 37 m away
- 2105 W 11th StJun 23, 2026Replacement of an existing water heater · 46 m away
- 2111 W 12th StDec 27, 2023Replacement of an existing water heater · 67 m away
- 2113 W 12th StJun 24, 2026Total demolition of sfr 768 sq ft circa 1951 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 73 m away
- 2111 W 11th StAug 1, 2025Install new 19.78 kw dc rooftop solar system to existing residential · 81 m away
- 1200 Winsted LnJun 16, 2025Construct new driveway approach of 12 ft. driveway approach on w 12th st · 81 m away
- 2114 W 11th StOct 27, 2026New pool for single family residence with plumbing permit · 88 m away
- 2115 W 12th StJun 24, 2026Total demolition of sfr 1680 sq ft circa 1963 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 90 m away
- 2118 W 12th StSep 11, 2026Repair corroded gas line going into house utility has locked out service · 90 m away
- 2113 W 11th StFeb 12, 2024New construction of 168 sq ft in-ground pool and 28.5 sq ft spa and 96 sq ft concrete deck with reqd enclosure device · 99 m away
- 1205 Dailey StJul 26, 2010Westfield a, resubdivision of lot 1a of the resubdivision of lot 1, block 2 · 99 m away
- 2117 W 11th StNov 5, 2026Replacement of mini-split system daikin entra 12000 btu heat pump mini split with one indoor head · 101 m away