HVAC system replacement permitted at 2103 Exposition Blvd
A City of Austin mechanical permit indicates replacement of the existing central heating and air system at 2103 Exposition Blvd. The permit, 2026-112461 MP, was filed on November 6, 2026, and describes replacing a 3-ton condenser and coil, with or without duct work and no structural changes.
Summarized from City of Austin records · updated Nov 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 6, 2026
- since Nov 6, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayReplacement of complete existing central heat and air system with or without duct work remove and replace existing 3-ton condenser and coil only. no structural change
- AppliedAug 27, 2026
- IssuedNov 6, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work remove and replace existing 3-ton condenser and coil only. no structural change
Replacement of complete existing central heat and air system with or without duct work remove and replace existing 3-ton condenser and coil only. no structural change
City of Austin permitMechanical PermitActive- Record
- 2026-112461 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2103 Exposition Blvd
What is happening at 2103 Exposition Blvd?
A City of Austin permit describes replacement of the existing central heat and air system, including a 3-ton condenser and coil. It does not describe new construction.
When was the HVAC permit filed for 2103 Exposition Blvd?
The permit was filed on November 6, 2026. Its number is 2026-112461 MP.
What does permit 2026-112461 MP cover?
It covers replacement of the existing 3-ton condenser and coil, with or without duct work, as part of replacing the central heating and air system.
Will the work at 2103 Exposition Blvd change the building's structure?
The permit description says there will be no structural change.
Is a new building planned at 2103 Exposition Blvd?
The available City of Austin record is for an HVAC system replacement, not a new building.
How much will the HVAC work at 2103 Exposition Blvd cost?
The permit record does not list a project valuation or estimated cost.
Also being built nearby
All of 78703- 2111 Exposition BlvdJun 10, 2026Replacement of an existing water heater 50 gallon natural gas water heater change out. 2111 exposition boulevard austin tx 78703 · 6 m away
- 2101 Exposition BlvdNov 25, 2008Lacoste addition — lacoste addition · 36 m away
- 2000 Exposition BlvdMar 31, 2014Hillview oak portions of lot 12 and 13; resubdivision · 68 m away
- 2005 Exposition BlvdJul 2, 2026*partial demolition* interior remodel 4/17/26 sm **revised**: full kitchen remodel to include removing doors and windows and a wall to open the space. adding windows to kitchen and primary bath cosmetic upgrades to all existing baths with a new free standing tub in primary all showers received new shower pans. new bath added in converted bedroom off of garage. some new lighting fixtures new paint and floors · 74 m away
- 2109 Exposition BlvdOct 28, 2010Todd addition, re-plat portion lot 8, block 18, westfield a subdivision — todd addition, re-plat portion lot 8, block 18, westfield a subdivision · 79 m away
- 2201 Exposition BlvdSep 15, 2026Replacement of complete existing central heat and air system with or without duct work · 84 m away
- 2106 Stamford LnJun 10, 2025Run a new 1-1/4 gas line from the meter down the side of the house and up to the attic · 93 m away
- 1909 Hill Oaks CtJul 1, 2025Installing gas line to emergency generator · 103 m away
- 2202 Stamford LnApr 3, 2024Replace sewer yard line from house connection to city tap · 105 m away
- 2204 Stamford LnJan 26, 2024Replacement of complete existing central heat and air system with or without duct work · 111 m away
- 2002 Stamford LnJul 18, 2025Express: foundation repair · 119 m away
- 2801 Gilbert StMay 1, 2025Installation of new 150kw 3 phase generator + updating meter by modifying the existing 600a 3 phase - 240v services from ct overhead to installing a trans socket · 135 m away