2202 Townes Ln
Austin, TX 78703
2202 Townes Ln: 2 projects on record
City of Austin lists 2 filings across 2 projects at 2202 Townes Ln, Austin, TX 78703 since July 17, 2024. The most recent, filed November 3, 2024, covers: “Install new gas line for generator. 10/31/24 sm - inspected gas rough and final. ok to pass once active”.
Compiled from City of Austin records · updated Nov 3, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Nov 3, 2024
- since Jul 17, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall new gas line for generator. 10/31/24 sm - inspected gas rough and final. ok to pass once active
- AppliedOct 24, 2024
- IssuedNov 3, 2024
- WorkNov '24 – Nov '24
- Final inspectionNov 4, 2024
Passed final inspection Nov 4, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall new gas line for generator. 10/31/24 sm - inspected gas rough and final. ok to pass once active
Install new gas line for generator. 10/31/24 sm - inspected gas rough and final. ok to pass once active
City of Austin permitPlumbing PermitFinal- Record
- 2024-142973 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
26kw whole home generator (natural gas) connected to house meter and main panel. no meter can required. (glenn hirsch)
26kw whole home generator (natural gas) connected to house meter and main panel. no meter can required. (glenn hirsch)
City of Austin permitElectrical PermitFinal- Record
- 2024-088009 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2202 Townes Ln
What is being built at 2202 Townes Ln?
The latest filing (City of Austin permit 2024-142973 PP, November 3, 2024) covers install new gas line for generator. 10/31/24 sm - inspected gas rough and final. ok to pass once active.
How many permits and filings does 2202 Townes Ln have?
2 filings across 2 projects, from July 17, 2024 to November 3, 2024.
Is there other construction near 2202 Townes Ln?
Yes. Nearby filings include 2201 Townes Ln (replacement of complete existing central heat and air system with or without duct work, Jun 19, 2025); 2205 Tower Dr (new irrigation installation, Mar 20, 2024); 2207 Townes Ln (new pool spa and concrete deck, Sep 22, 2026).
How do I get alerts for new permits at 2202 Townes Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78703- 2201 Townes LnJun 19, 2025Replacement of complete existing central heat and air system with or without duct work · 52 m away
- 2205 Tower DrMar 20, 2024New irrigation installation · 56 m away
- 2207 Townes LnSep 22, 2026New pool spa and concrete deck · 62 m away
- 2208 Townes LnOct 1, 2025Replacement of mini-split system · 62 m away
- 2108 Townes LnApr 14, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 3 ton ac system and includes removal and replacement of up to 25 feet of ductwork · 65 m away
- 2207 Tower DrSep 24, 2024Replacement of complete existing central heat and air system with or without duct work · 68 m away
- 2505 Dormarion LnJan 7, 2026Addition of studio to side of residence · 81 m away
- 2301 Townes LnJun 27, 2024Structural interior remodel of kitchen & bathroom adding half bath · 93 m away
- 2300 Townes LnApr 24, 2024Replacement of complete existing central heat and air system with or without duct work · 94 m away
- 2202 Bowman AveJul 11, 2024Replacement of complete existing central heat and air system with or without duct work · 95 m away
- 2206 Tower DrAug 13, 2026Retroactive permitting of a solid fence ranging in height from 7-9 to 8-0. fence is currently 8-7 at its highest point but will be modified to be 8-0 after issuance of permit · 107 m away
- 2300 Tower DrSep 9, 2025New pool · 117 m away