2211 Lake Austin Blvd
Austin, TX 78703
2211 Lake Austin Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 2211 Lake Austin Blvd, Austin, TX 78703. The most recent, filed March 6, 2025, covers: “Express: foundation repair”.
Compiled from City of Austin records · updated Mar 6, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 6, 2025
- since Mar 6, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: foundation repair
- AppliedMar 5, 2025
- IssuedMar 6, 2025
- WorkMar '25 – Mar '25
- Final inspectionMar 19, 2025
Passed final inspection Mar 19, 2025.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: foundation repair
Express: foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2025-026506 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2211 Lake Austin Blvd
What is being built at 2211 Lake Austin Blvd?
The latest filing (City of Austin permit 2025-026506 BP, March 6, 2025) covers express: foundation repair.
How many permits and filings does 2211 Lake Austin Blvd have?
1 filing across 1 project, from March 6, 2025 to March 6, 2025.
Is there other construction near 2211 Lake Austin Blvd?
Yes. Nearby filings include 2301 Lake Austin Blvd (express: foundation repair, Mar 6, 2025); 2203 Lake Austin Blvd (doctor's office, Mar 2, 2007); 2208 Lake Austin Blvd (professional building, Mar 2, 2007).
How do I get alerts for new permits at 2211 Lake Austin Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78703- 2301 Lake Austin BlvdMar 6, 2025Express: foundation repair · 30 m away
- 2203 Lake Austin BlvdMar 2, 2007Doctor's office · 46 m away
- 2208 Lake Austin BlvdMar 2, 2007Professional building · 64 m away
- 2300 Lake Austin BlvdNov 20, 2025Replace asphalt shingles with gaf timberline hdz shingles · 67 m away
- 404 Atlanta StMar 27, 2024Replacement of complete existing central heat and air system with or without duct work · 79 m away
- 2311 Lake Austin BlvdMar 2, 2007House renovation · 88 m away
- 2304 Lake Austin BlvdJul 24, 2026Repair of improperly installed gas line at meter. meter pulled and capped. extension of gas line to new connection point with pressure test. work to be completed prior to meter reinstallation by utility · 95 m away
- 2307 Foster AveFeb 28, 2025Install new natural gas option generator automatic transfer switch an add a docking station on equipment pad with new concrete pad for existing fs17. site plan exemption not required less than 100 sq ft · 98 m away
- 2308 Lake Austin BlvdJan 9, 2025Replacement of the sewer yard line · 114 m away
- 507 Upson StJan 28, 2009Charles johnson addition, amended plat of lots 2-4, block 4 — charles johnson addition, amended plat of lots 2-4, block 4 · 116 m away
- 409 Deep Eddy AveNov 18, 2024Remodel of the existing structure foundation and roof repair and new deck. adding insulation and bringing the building up to existing accessibility code · 119 m away
- 2315 Lake Austin BlvdMar 23, 2026Completely remove existing historical tile wood shingles and spaced sheathing down to structure for existing sloped concrete tile roof. clean and salvage historical tile for re-installation. project proposes using waterseal tile to match existing or tejas borja alicantina interlocking tile · 122 m away