2304 Greenlee Dr
Austin, TX 78703
2304 Greenlee Dr: 3 projects on record
City of Austin lists 3 filings across 3 projects at 2304 Greenlee Dr, Austin, TX 78703. The most recent, filed December 6, 2023, covers: “New pool (245 sq ft) and spa (84 sq ft) & concrete decking (229 sq ft)”.
Compiled from City of Austin records · updated Dec 6, 2023
- Projects
- 3
- 3 filings
- Latest filing
- Dec 6, 2023
- since Dec 6, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNew pool (245 sq ft) and spa (84 sq ft) & concrete decking (229 sq ft)
- AppliedMay 16, 2023
- IssuedDec 6, 2023
- WorkDec '23 – Jan '24
- Final inspectionJan 11, 2024
Passed final inspection Jan 11, 2024.
1 contact on this project · 1 phone number
Permit & project history
3 projectsNew pool (245 sq ft) and spa (84 sq ft) & concrete decking (229 sq ft)
New pool (245 sq ft) and spa (84 sq ft) & concrete decking (229 sq ft)
City of Austin permitPlumbing PermitFinal- Record
- 2023-108051 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New pool (245 sq ft) and spa (84 sq ft) & concrete decking (229 sq ft)
New pool (245 sq ft) and spa (84 sq ft) & concrete decking (229 sq ft)
City of Austin permitElectrical PermitFinal- Record
- 2023-108051 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New pool (245 sq ft) and spa (84 sq ft) & concrete decking (229 sq ft)
New pool (245 sq ft) and spa (84 sq ft) & concrete decking (229 sq ft)
City of Austin permitBuilding PermitFinal- Record
- 2023-108051 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2304 Greenlee Dr
What is being built at 2304 Greenlee Dr?
The latest filing (City of Austin permit 2023-108051 PP, December 6, 2023) covers new pool (245 sq ft) and spa (84 sq ft) & concrete decking (229 sq ft).
How many permits and filings does 2304 Greenlee Dr have?
3 filings across 3 projects, from December 6, 2023 to December 6, 2023.
Is there other construction near 2304 Greenlee Dr?
Yes. Nearby filings include 2302 Greenlee Dr (austin energy home energy savings job with a/c and duct replacement, Jul 17, 2026); 2305 Sunny Slope Dr (replacement of an existing water heater replace like/like g water heater, Mar 30, 2026); 2210 Greenlee Dr (replacement of complete existing central heat and air system with or without duct work, Nov 13, 2025).
How do I get alerts for new permits at 2304 Greenlee Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78703- 2302 Greenlee DrJul 17, 2026Austin energy home energy savings job with a/c and duct replacement · 23 m away
- 2305 Sunny Slope DrMar 30, 2026Replacement of an existing water heater replace like/like g water heater · 51 m away
- 2210 Greenlee DrNov 13, 2025Replacement of complete existing central heat and air system with or without duct work · 70 m away
- 2303 Sunny Slope DrJul 30, 20267.36kw rooftop solar install · 71 m away
- 2604 St Anthony StNov 2, 2026New pool & spa for single family residence (with plumbing permit) · 85 m away
- 2306 Sunny Slope DrSep 12, 2024Install an tesla charger in garage · 86 m away
- 2211 Greenlee DrFeb 3, 2026***timed in-person inspection: 02/18/2026 @ 9 am*** replacement of complete existing central heat and air system with or without duct work · 89 m away
- 2208 Greenlee DrMay 12, 2026*** called out to contractor about expired 2024-054670 pp he agrees to have that tank inspected as part of this repair since it was installed but not inspected in 2024. prior permit voided. *** moving the tankless from the garage to the attic · 92 m away
- 2403 Greenlee DrMay 23, 2024Replacement of complete existing central heat and air system with or without duct work · 95 m away
- 2301 Sunny Slope DrFeb 29, 2024Tunnel below the foundation to repair drain line · 95 m away
- 2310 Tower DrNov 7, 2024Interior remodel bathroom remodel kitchen remodel storage room front door replacement cracked unsafe bricks at front entry electrical work plumbing work (full scope attached) · 95 m away
- 2304 Tower DrJan 14, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas system · 126 m away