groundranger
Recent · latest filing Jul 2026Residential

2401 Sweetbrush Dr

Austin, TX 78703

Residential HVAC and electrical work at 2401 Sweetbrush Dr

Permits indicate replacement of the existing central heating and air system and the electrical meter base at this residence. The electrical permit was filed May 13, 2025, and the mechanical permit was filed July 23, 2026.

Summarized from City of Austin records · updated Jul 23, 2026

Projects
2
2 filings
Latest filing
Jul 23, 2026
since May 13, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work

  1. AppliedJul 15, 2020
  2. IssuedJul 23, 2026
  3. WorkJul '26 – Aug '26
  4. Final inspectionAug 28, 2026

Passed final inspection Aug 28, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replace meterbase only. ae gave notice this must be done to add 5th terminal

    Replace meterbase only. ae gave notice this must be done to add 5th terminal

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2401 Sweetbrush Dr

What is being built at 2401 Sweetbrush Dr?

The permits indicate residential system upgrades, not a new building: replacement of the central heating and air system and the electrical meter base.

Is a new house going up at 2401 Sweetbrush Dr?

The available permits describe replacement work on the existing central heating and air system and meter base. They do not describe construction of a new house.

What HVAC work is planned at 2401 Sweetbrush Dr?

A City of Austin mechanical permit describes replacement of the complete existing central heat and air system, with or without duct work. Permit 2020-105391 MP was filed July 23, 2026.

What electrical work is planned at 2401 Sweetbrush Dr?

A City of Austin electrical permit describes replacing the meter base. Permit 2025-053976 EP was filed May 13, 2025.

When were permits filed for work at 2401 Sweetbrush Dr?

The electrical permit was filed May 13, 2025, and the mechanical permit was filed July 23, 2026.

Also being built nearby

All of 78703
Email me when a new permit is filed