groundranger
Historic · latest filing Nov 2024Residential

2402 Pemberton Pkwy

Austin, TX 78703

2402 Pemberton Pkwy: 2 projects on record

City of Austin lists 2 filings across 2 projects at 2402 Pemberton Pkwy, Austin, TX 78703 since November 14, 2024. The most recent, filed November 22, 2024, covers: “Installing a 26kw generator and connecting it to natural gas”.

Compiled from City of Austin records · updated Nov 22, 2024

Projects
2
2 filings
Latest filing
Nov 22, 2024
since Nov 14, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Installing a 26kw generator and connecting it to natural gas

  1. AppliedNov 13, 2024
  2. IssuedNov 22, 2024
  3. WorkNov '24 – Dec '24
  4. Final inspectionDec 20, 2024

Passed final inspection Dec 20, 2024.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Installing a 26kw generator and connecting it to natural gas

    Installing a 26kw generator and connecting it to natural gas

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installing generator 26kw and ats

    Installing generator 26kw and ats

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2402 Pemberton Pkwy

What is being built at 2402 Pemberton Pkwy?

The latest filing (City of Austin permit 2024-151326 PP, November 22, 2024) covers installing a 26kw generator and connecting it to natural gas.

How many permits and filings does 2402 Pemberton Pkwy have?

2 filings across 2 projects, from November 14, 2024 to November 22, 2024.

What is being built near Park Terrace in Austin?

2402 Pemberton Pkwy is about 204 m from Park Terrace (1301 W 25th St). Its latest filing is for installing a 26kw generator and connecting it to natural gas.

Is there other construction near 2402 Pemberton Pkwy?

Yes. Nearby filings include 2403 Pemberton Pl (interior remodel, Aug 21, 2024); 2401 Pemberton Pl (replacement of an existing water heater, Apr 21, 2025); 2407 Pemberton Pl (new inground pool with autofill and heating system. leuder patio sport court with wire mesh fence 1/2 steel plate retaining planter concrete steps with handrail and landscape planting, Jun 26, 2025).

How do I get alerts for new permits at 2402 Pemberton Pkwy?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78703
Email me when a new permit is filed