2509 Spring Ln
Austin, TX 78703
Bathroom addition and remodel permitted at 2509 Spring Ln
A City of Austin permit indicates an addition and remodel to the existing single-family home at 2509 Spring Ln, including one bathroom. The permit was filed on October 20, 2026, and is listed as active.
Summarized from City of Austin records · updated Oct 20, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 20, 2026
- since Oct 20, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayAddition/remodel of existing sfr addition of 1 bath
- AppliedApr 27, 2026
- IssuedOct 20, 2026
- WorkOct '26 – Apr '27
- Final inspection
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectAddition/remodel of existing sfr addition of 1 bath
Addition/remodel of existing sfr addition of 1 bath
City of Austin permitBuilding PermitActive- Record
- 2026-102403 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2509 Spring Ln
What is being built at 2509 Spring Ln in Austin?
A City of Austin permit describes an addition and remodel to the existing single-family home, including one bathroom.
Is 2509 Spring Ln a new home development?
The permit describes work on an existing single-family home, not a new home.
When was the permit filed for 2509 Spring Ln?
The City of Austin permit was filed on October 20, 2026.
What is the permit number for work at 2509 Spring Ln?
The permit number is 2026-102403 BP. It is listed as active.
Does the permit for 2509 Spring Ln include a bathroom?
Yes. The permit description specifies the addition of one bathroom as part of an addition and remodel to the existing home.
Also being built nearby
All of 78703- 2507 Spring LnMay 5, 2026Install new water softener. rough in water softener loop on water line in yard and tie in softener drain to existing sewer yard line · 18 m away
- 2512 Janice DrOct 7, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton single stage heat pump · 47 m away
- 2514 Spring LnNov 1, 2024Request to disconnect for installation of 200-amp automatic transfer switch and 24 kw generator · 51 m away
- 2503 Spring LnOct 14, 2025Repairing pvc 3 line at master toilet going towards hall bath only · 60 m away
- 2516 Spring LnJun 26, 2025Install outlets in the new outdoor grill station · 64 m away
- 2510 Janice DrMay 23, 2025Express: window replacement (two windows like for like) · 71 m away
- 2501 Tower DrJan 17, 2025Repipe bathroom in crawl space for proper fall and remove the 90 (elbow) · 76 m away
- 2502 Spring LnJun 4, 2025Gas leak repair replaced about 5 feet of gas line · 89 m away
- 2520 Spring LnNov 4, 2026Installation of 1 generac 28 kw standby generator ats and span panel · 103 m away
- 2500 Spring LnAug 6, 2025***timed virtual inspection: 04/27/2026 @ 1 pm*** replacement of complete existing central heat and air system with or without duct work like for like: 1.5 ton horizontal heat pump system · 107 m away
- 2509 Exposition BlvdJul 8, 2026Whole house filtration and softening system · 120 m away
- 2513 Exposition BlvdDec 31, 202540ft tunnel to repair sewer line · 120 m away