2705 Verde Vista

Austin, TX 78703

Rooftop solar and battery storage at an Austin home

Permits indicate a 28.52-kW rooftop solar system and 54.0-kWh energy storage system were installed at the existing residence. The solar permit was filed January 10, 2024; a later electrical permit, filed September 17, 2025, covers a temporary disconnect to connect a Tesla Gateway and install a 200-amp transfer switch.

Summarized from City of Austin records · updated Sep 17, 2025

Projects
2
2 filings
Latest filing
Sep 17, 2025
since Jan 10, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Temporary disconnect to cut in tesla gateway. installing 200 amp transfer switch

  1. AppliedSep 12, 2025
  2. IssuedSep 17, 2025
  3. WorkSep '25 – Jan '26
  4. Final inspectionJan 15, 2026

Passed final inspection Jan 15, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Temporary disconnect to cut in tesla gateway. installing 200 amp transfer switch

    Temporary disconnect to cut in tesla gateway. installing 200 amp transfer switch

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install new 28.52 kw dc rooftop solar system and 54.0 kwh energy storage system to existing residential

    Install new 28.52 kw dc rooftop solar system and 54.0 kwh energy storage system to existing residential

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2705 Verde Vista

What is being built at 2705 Verde Vista?

City of Austin permits indicate rooftop solar and battery storage at the existing residence, followed by electrical work for a Tesla Gateway and 200-amp transfer switch.

Is there a solar installation at 2705 Verde Vista?

Yes. Permit 2023-161198 EP, filed January 10, 2024, describes a 28.52-kW DC rooftop solar system.

Is battery storage planned for the home?

The January 10, 2024 permit describes a 54.0-kWh energy storage system alongside the rooftop solar installation.

What is the 2025 electrical permit for?

Permit 2025-116382 EP, filed September 17, 2025, describes a temporary disconnect to connect a Tesla Gateway and install a 200-amp transfer switch.

Are the permits for a new home?

No new home is described in these records. The solar and storage work is described as being at an existing residence.

What is the status of the permits?

Both City of Austin electrical permits are listed as Final.