2706 Cherry Ln

Austin, TX 78703

5.98 kW solar system and Enphase battery permitted

A 5.98 kW solar system with one Enphase battery is being installed at 2706 Cherry Ln. The City of Austin issued an active electrical permit for the solar installation on November 13, 2026, and another active permit for temporary disconnect and reconnect work on November 6, 2026.

Summarized from City of Austin records · updated Nov 13, 2026

Projects
2
2 filings
Latest filing
Nov 13, 2026
since Nov 6, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Solar installtion with a system size of 5.98kw and (1) enphase battery

  1. AppliedNov 2, 2026
  2. IssuedNov 13, 2026
  3. WorkNov '26 – May '27
  4. Final inspection
1% through of the permit windowNov 13, 2026 → May 12, 2027

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Solar installtion with a system size of 5.98kw and (1) enphase battery

    Solar installtion with a system size of 5.98kw and (1) enphase battery

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Temporay disconnect/reconnect for a 10c enphase battery

    Temporay disconnect/reconnect for a 10c enphase battery

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2706 Cherry Ln

What is being installed at 2706 Cherry Ln?

City of Austin permit 2026-144445 EP describes a 5.98 kW solar installation with one Enphase battery.

Is there a permit for a solar installation at 2706 Cherry Ln?

Yes. The City of Austin issued active electrical permit 2026-144445 EP on November 13, 2026.

Is an Enphase battery being installed at 2706 Cherry Ln?

The November 13, 2026, permit describes one Enphase battery as part of the 5.98 kW solar installation.

What is permit 2026-144463 EP for at 2706 Cherry Ln?

The active City of Austin electrical permit, issued November 6, 2026, is for temporary disconnect and reconnect work for an Enphase battery.

When were the permits filed for work at 2706 Cherry Ln?

The two City of Austin permits are dated November 6 and November 13, 2026. They cover temporary disconnect and reconnect work and a 5.98 kW solar installation with one Enphase battery.