2711 Maria Anna Rd
Austin, TX 78703
Home system upgrades permitted at 2711 Maria Anna Rd
Austin permits indicate upgrades to the home’s plumbing and heating and air systems, rather than a new building. A water heater replacement permit was filed October 4, 2024, and a central heating and air replacement permit followed November 11, 2024; both are marked final. A water-conditioning system permit was filed August 1, 2025, and is marked expired.
Summarized from City of Austin records · updated Aug 1, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Aug 1, 2025
- since Oct 4, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredWe will be installing a halo 5 water conditioning system
- AppliedJul 31, 2025
- IssuedAug 1, 2025
- !WorkAug '25 – Jan '26
- Final inspection
Marked expired Jan 29, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsWe will be installing a halo 5 water conditioning system
We will be installing a halo 5 water conditioning system
City of Austin permitPlumbing PermitExpired- Record
- 2025-096218 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work change out: replacement of complete existing central heat and air systems with or without duct work-- no duct work 1unit
Replacement of complete existing central heat and air system with or without duct work change out: replacement of complete existing central heat and air systems with or without duct work-- no duct work 1unit
City of Austin permitMechanical PermitFinal- Record
- 2024-145984 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-131164 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2711 Maria Anna Rd
What is being built at 2711 Maria Anna Rd?
The permits on record indicate home system upgrades, including a water heater replacement, a central heating and air replacement, and an installation of a water-conditioning system. They do not indicate a new building.
Is a new home being built at 2711 Maria Anna Rd in Austin?
The three Austin permits listed for the address cover replacements or system installation, not new home construction. The records do not describe a new building.
What work does permit 2024-145984 MP cover?
The November 11, 2024 mechanical permit covers replacement of the existing central heating and air system, with no ductwork. Its status is final.
Was the water heater replaced at 2711 Maria Anna Rd?
An Austin plumbing permit filed October 4, 2024, covers replacement of an existing water heater. Permit 2024-131164 PP is marked final.
Is a water-conditioning system being installed at 2711 Maria Anna Rd?
Permit 2025-096218 PP, filed August 1, 2025, describes installation of a Halo 5 water-conditioning system. The permit is marked expired.
Also being built nearby
All of 78703- 2709 Maria Anna RdApr 14, 2026Express- remove and replace 3 windows · 26 m away
- 2712 Maria Anna RdJun 18, 2024In ground swimming pool and spa with required enclosure device for existing sfr with autofill · 55 m away
- 2804 Northwood RdSep 8, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas system · 66 m away
- 2706 Maria Anna RdMay 22, 2024Replacement of complete existing central heat and air system with or without duct work · 79 m away
- 2900 Northwood RdJan 3, 2025Replacement of complete existing central heat and air system with or without duct work 1.5 ton electric heat pump · 87 m away
- 2700 Verde Bank CirNov 18, 2026Base: installing a backup battery system and additional meter socket · 102 m away
- 2902 Northwood RdJun 5, 2025Remove existing uncovered deck and screened porch at rear of existing 3-story single family residence to be replaced with new screened porch and uncovered wood deck. add stone patio. full interior renovation of 1st & 2nd floor levels: partial renovation of 3 floor. new hvac equipment and ductwork new doors & windows · 105 m away
- 2606 Escondido CvFeb 29, 2024Replacement of complete existing central heat and air system with or without duct work · 110 m away
- 2704 Maria Anna RdSep 22, 2025Replacement of an existing water heater replace existing gas water heater · 110 m away
- 2800 Northwood RdJun 3, 2026Replacement of complete existing central heat and air system with or without duct work · 114 m away
- 2805 Mountain Laurel DrAug 10, 2026New pool and spa · 114 m away
- 2802 Deercreek CirOct 23, 2026The contractor is looking to reconnect gas service to this home. we (pure water plumbing systems will be performing a gas pressure test on home to ensure that there are no leaks before service can be restored · 118 m away