2904 Hillview Rd
Austin, TX 78703
2904 Hillview Rd: 2 projects on record
City of Austin lists 2 filings across 2 projects at 2904 Hillview Rd, Austin, TX 78703 since July 30, 2024. The most recent, filed August 12, 2024, covers: “Approximately 20 of gas piping from gas meter to new home generator”.
Compiled from City of Austin records · updated Aug 12, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Aug 12, 2024
- since Jul 30, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledApproximately 20 of gas piping from gas meter to new home generator
- AppliedAug 12, 2024
- IssuedAug 12, 2024
- WorkAug '24 – Aug '24
- Final inspectionAug 14, 2024
Passed final inspection Aug 14, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsApproximately 20 of gas piping from gas meter to new home generator
Approximately 20 of gas piping from gas meter to new home generator
City of Austin permitPlumbing PermitFinal- Record
- 2024-101122 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Request to disconnect existing 200 amp meter can installation of a 200 a ats
Request to disconnect existing 200 amp meter can installation of a 200 a ats
City of Austin permitElectrical PermitFinal- Record
- 2024-092829 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2904 Hillview Rd
What is being built at 2904 Hillview Rd?
The latest filing (City of Austin permit 2024-101122 PP, August 12, 2024) covers approximately 20 of gas piping from gas meter to new home generator.
How many permits and filings does 2904 Hillview Rd have?
2 filings across 2 projects, from July 30, 2024 to August 12, 2024.
Is there other construction near 2904 Hillview Rd?
Yes. Nearby filings include 3102 Maywood Ave (base: installing a backup battery system and additional meter socket, Oct 28, 2026); 2903 Hillview Rd (interior remodel addition to existing residence new detached garage with dwelling unit above, Dec 8, 2025); 2902 Windshill Cir (expedited review - new addition of exterior stairs and installation of new outdoor shower, Apr 24, 2024).
How do I get alerts for new permits at 2904 Hillview Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78703- 3102 Maywood AveOct 28, 2026Base: installing a backup battery system and additional meter socket · 52 m away
- 2903 Hillview RdDec 8, 2025Interior remodel addition to existing residence new detached garage with dwelling unit above · 69 m away
- 2902 Windshill CirApr 24, 2024Expedited review - new addition of exterior stairs and installation of new outdoor shower · 71 m away
- 3001 Hillview RdApr 17, 2024Replacement of complete existing central heat and air system with or without duct work · 73 m away
- 2901 Hillview RdSep 29, 2025Interior remodel - reconfigure bedrooms bathroom closets. update kitchen. roll in scope of work from expired mp#: 2023-086182 · 79 m away
- 3104 Maywood AveJan 22, 2024Install evse at garage · 80 m away
- 3003 Hillview RdNov 3, 2025Total demolition of detached garage 460 sq ft · 84 m away
- 2801 Deercreek CirMar 18, 2024Replacement of complete existing central heat and air system with or without duct work · 100 m away
- 3106 Maywood AveAug 3, 2026Total demolition of sfr 2400 sq ft circa 1968 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 116 m away
- 3202 Maywood AveSep 21, 2026Express: replace 5 windows like for like · 122 m away
- 3105 Pleasant Run PlSep 23, 2026Replace broken sewer line · 123 m away
- 2714 Mountain Laurel LnOct 28, 2026New swimming pool and spa · 123 m away