3000 Oakmont Blvd
Austin, TX 78703
HVAC system replaced at 3000 Oakmont Blvd
A complete existing central heating and air system was replaced with one new HVAC system without ductwork at 3000 Oakmont Blvd. The City of Austin permit was filed on April 8, 2026, and is marked final.
Summarized from City of Austin records · updated Apr 8, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 8, 2026
- since Apr 8, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork
- AppliedApr 7, 2026
- IssuedApr 8, 2026
- WorkApr '26 – Apr '26
- Final inspectionApr 23, 2026
Passed final inspection Apr 23, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork
Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork
City of Austin permitMechanical PermitFinal- Record
- 2026-041831 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3000 Oakmont Blvd
What is being built at 3000 Oakmont Blvd?
The permit records replacement of the existing central heat and air system with one new HVAC system, without ductwork. It does not describe a new building.
Was a new home permitted at 3000 Oakmont Blvd?
The recorded permit is for HVAC system replacement, not new home construction. It was filed April 8, 2026.
When was the HVAC permit filed for 3000 Oakmont Blvd?
The City of Austin permit was filed on April 8, 2026. Its permit number is 2026-041831 MP.
Is the 3000 Oakmont Blvd permit final?
Yes. The City of Austin lists permit 2026-041831 MP as final.
Does the 3000 Oakmont Blvd HVAC permit include new ductwork?
The permit description says the system was replaced without ductwork.
What type of permit was filed at 3000 Oakmont Blvd?
It is a City of Austin mechanical permit for replacement of the existing central heat and air system.
Also being built nearby
All of 78703- 3001 Funston StAug 12, 2024Installing a new irrigation system · 35 m away
- 3001 Oakmont BlvdApr 16, 2024New inground swimming pool with reqd enclosure device · 43 m away
- 3007 Oakmont BlvdJun 1, 2026Install a full lawn sprinkler system · 62 m away
- 1807 W 30th StNov 10, 2026New install on new home build · 63 m away
- 2907 Oakmont BlvdJan 9, 20262907 oakmont blvd new 2 story sfr with attached garage and covered porch. 2/2 · 75 m away
- 3101 Funston StOct 28, 2025Gas line attached to wall for pool heater · 76 m away
- 3101 Oakmont BlvdJun 21, 2024Replacement of complete existing central heat and air system with or without duct work · 81 m away
- 1805 W 30th StMar 31, 2025Conversion from overhead to underground service · 82 m away
- 3102 Oakmont BlvdMar 29, 2024New inground swimming pool with reqd enclosure device for existing 2-story sfr · 83 m away
- 3006 Funston StMar 18, 2026Replacement of complete existing central heat and air system with or without duct work · 86 m away
- 3103 Funston StMay 7, 2025New pool - swimming pool and spa · 93 m away
- 3006 Beverly RdSep 5, 2024New construction in-ground pool and spa · 96 m away