Permits for an EV charger and home updates at 3001 Wade Ave
City of Austin permits at 3001 Wade Ave cover an electric vehicle charging station and home-system updates, not a new building. The latest permit, for the charging station, was filed August 20, 2026; a tankless water heater permit was filed June 25, 2026.
Summarized from City of Austin records · updated Aug 20, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Aug 20, 2026
- since Feb 6, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledElec. vehicle charging station
- AppliedAug 13, 2026
- IssuedAug 20, 2026
- WorkAug '26 – Feb '27
- Final inspectionSep 14, 2026
Passed final inspection Sep 14, 2026.
1 contact on this project
Permit & project history
4 projectsElec. vehicle charging station
Elec. vehicle charging station
City of Austin permitElectrical PermitFinal- Record
- 2026-106000 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installing a tankless water heater
Installing a tankless water heater
City of Austin permitPlumbing PermitFinal- Record
- 2026-078887 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitActive- Record
- 2024-032744 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-013320 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3001 Wade Ave
What is being built at 3001 Wade Ave?
Austin permit records show an electric vehicle charging station and home-system work, including a tankless water heater. They do not identify a new building.
Is an EV charging station planned at 3001 Wade Ave?
A City of Austin electrical permit describes an electric vehicle charging station. Permit 2026-106000 EP was filed August 20, 2026, and its status is Final.
What work was permitted at 3001 Wade Ave in 2026?
The records include a tankless water heater permit filed June 25, 2026, and an electric vehicle charging station permit filed August 20, 2026. Both are listed as Final.
Was HVAC work permitted at 3001 Wade Ave?
Yes. Permit 2024-032744 MP, filed March 18, 2024, covers replacement of the existing central heating and air system, with or without duct work. Its status is Active.
Was a water heater replacement permitted at 3001 Wade Ave?
Records show a permit to replace an existing water heater, filed February 6, 2024, and a separate tankless water heater permit filed June 25, 2026. Both are listed as Final.
Also being built nearby
All of 78703- 3003 Wade AveFeb 29, 2024Replacement of an existing water heater · 27 m away
- 2903 Wade AveJun 16, 2026Replacement of complete existing central heat and air system with or without duct work · 35 m away
- 3100 Pecos StAug 21, 202695 tunnel below the foundation to replace entire drain system. 40 trench to replace yard sewer. 3 access holes - left right front · 39 m away
- 3102 Pecos StApr 25, 2024Gas line for generator · 57 m away
- 3005 Wade AveApr 3, 2026Renovation of ground floor of existing home including garage conversion to interior conditioned space and relocation of driveway to newly proposed carport structure · 61 m away
- 3000 Wade AveDec 15, 2023Replacement of complete existing central heat and air system with or without duct work · 70 m away
- 2900 Wade AveOct 11, 2024New construction accessory to primary use detached pool bath: full bath with outdoor kitchen. 12/10/25 sm - no outdoor kitchen only an exterior unconditioned bathroom with shower and sauna · 77 m away
- 2900 Pecos StFeb 5, 2024Replacement of an existing water heater · 85 m away
- 2806 Pecos StOct 19, 2026Two-unit use: new construction studio space with attached 3-car garage and full bath · 101 m away
- 3402 Taylors DrSep 17, 2025Install a full lawn sprinkler system · 106 m away
- 3000 Willowood CirApr 9, 2026Replace the main electrical service mast; new mast will penetrate through the roof. the existing meter enclosure will be utilized only the mast wires for the mast and the point of attachment will be replaced and a roof flashing will be installed at the roof penetration · 107 m away
- 3106 Maywood AveAug 3, 2026Total demolition of sfr 2400 sq ft circa 1968 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 114 m away