groundranger
Recent · latest filing Oct 2025Residential

3309 Cherry Ln

Austin, TX 78703

Rooftop solar and energy storage permitted at 3309 Cherry Ln

Austin permits dated October 24, 2025, cover a 13.17 kW rooftop solar system and 13.5 kW energy storage system for an existing residence at 3309 Cherry Ln. A separate permit dated October 29 covers disconnecting and reconnecting to upgrade the main distribution panel.

Summarized from City of Austin records · updated Oct 29, 2025

Projects
2
2 filings
Latest filing
Oct 29, 2025
since Oct 24, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Disconnect/reconnect to upgrade main distribution panel

  1. AppliedOct 22, 2025
  2. IssuedOct 29, 2025
  3. WorkOct '25 – Nov '25
  4. Final inspectionNov 25, 2025

Passed final inspection Nov 25, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Disconnect/reconnect to upgrade main distribution panel

    Disconnect/reconnect to upgrade main distribution panel

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install new 13.17 kw rooftop solar system and 13.5kw energy storage system for existing residential only

    Install new 13.17 kw rooftop solar system and 13.5kw energy storage system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 3309 Cherry Ln

What is being built at 3309 Cherry Ln?

A City of Austin permit covers a 13.17 kW rooftop solar system and 13.5 kW energy storage system for an existing residence. The permit was filed October 24, 2025, under number 2025-136209 EP.

Is there a new home being built at 3309 Cherry Ln?

The records provided show electrical permits for an existing residence, not a new home. They cover rooftop solar, energy storage, and a main distribution panel upgrade.

Is a battery being installed at 3309 Cherry Ln?

A City of Austin permit describes a 13.5 kW energy storage system alongside a 13.17 kW rooftop solar system. The permit date is October 24, 2025.

What electrical work is permitted at 3309 Cherry Ln?

Two electrical permits were filed in October 2025. One covers solar and energy storage; the other covers disconnecting and reconnecting to upgrade the main distribution panel.

When were the permits filed for 3309 Cherry Ln?

The solar and energy storage permit, 2025-136209 EP, was filed October 24, 2025. The main distribution panel permit, 2025-136941 EP, was filed October 29, 2025.

What does permit 2025-136941 EP cover at 3309 Cherry Ln?

It covers disconnecting and reconnecting to upgrade the main distribution panel. The City of Austin permit is dated October 29, 2025.

Also being built nearby

All of 78703

More warehouses & industrial in 78703, solar installs in 78703.

Email me when a new permit is filed