3309 Kerbey Lane
Austin, TX 78703 · Aisd Renovations At Bryker Woods Elementary School, Security Vestibule - Bryker Woods
Renovations and security vestibule work at 3309 Kerbey Lane
TDLR registrations describe school-related renovations and security vestibule work at this multi-tenant property. The latest registration, filed July 17, 2025, covers rooftop mechanical units, electrical panels, door hardware and exterior windows; an earlier security vestibule registration was filed April 30, 2024.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 17, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jul 17, 2025
- since Apr 30, 2024
- Largest scope
- 15,000 sf
- Estimated cost
- $3.2M
- state registration
Where this project stands
Finishing up · inspection nextAISD Renovations at Bryker Woods Elementary School
15,000 sq ft · $3.2M est.
- RegisteredJul 17, 2025
- Plan review
- ConstructionJun '26 – Aug '26
- Inspectednow
- Closed
Scheduled to finish Aug 14, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsThe scope includes replacing rooftop mechanical units, replacing (3) electrical panels, replacing door hardware in (2) areas, and replacing exterior windows as prioritized by austin isd. — bryker woods elementary school
TDLR project registrationRenovation/AlterationReview Complete15,000 sq ft$3.2M est.- Project #
- TABS2025023756
- Tenant / owner
- Aisd Renovations At Bryker Woods Elementary School
- Design firm
- Pro
- Contact
- Pro
New card readers install on existing doors and new storefront enclosure. — bryker woods elementary school
TDLR project registrationRenovation/AlterationProject Closed202 sq ft$130K est.- Project #
- TABS2024017375
- Tenant / owner
- Security Vestibule - Bryker Woods
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3309 Kerbey Lane
What is being built at 3309 Kerbey Lane?
TDLR registrations describe renovations and security vestibule work associated with Bryker Woods Elementary School at this multi-tenant property. The work includes mechanical, electrical, door hardware and window updates.
Is Bryker Woods Elementary School getting renovations?
A TDLR registration filed July 17, 2025, describes replacing rooftop mechanical units, three electrical panels, door hardware in two areas and prioritized exterior windows. The registration is TABS2025023756.
What work is planned for the security vestibule at 3309 Kerbey Lane?
A TDLR registration filed April 30, 2024, describes installing card readers on existing doors and a new storefront enclosure. The project is TABS2024017375.
When were the projects at 3309 Kerbey Lane filed?
The security vestibule project was registered April 30, 2024, and the renovation project was registered July 17, 2025.
How much is the renovation project at 3309 Kerbey Lane estimated to cost?
The applicant's TDLR estimate for the renovation project filed July 17, 2025, is $3,153,306. This is an estimate, not a reported final project cost.
How large is the Bryker Woods renovation project?
The July 17, 2025, TDLR registration lists 15,000 square feet for the renovation project.
Also being built nearby
All of 78703- 3300 Kerbey LnNov 24, 2025Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <60 feet new 3/4 emt conduit approx. to power the level 2 ev charger at 48amp constant draw · 30 m away
- 3306 Kerbey LnJul 25, 2024Replacement of complete existing central heat and air system with or without duct work · 58 m away
- 3308 Kerbey LnNov 10, 2026Replacement of complete existing central heat and air system with or without duct work · 74 m away
- 3309 Kerbey LnJun 9, 2026Hvac replacement - building b · 75 m away
- 3307 Glenview AveDec 12, 2023Replacement of an existing gas water heater · 88 m away
- 3309 Glenview AveJul 2, 2024***sewer line replacement from the home to city tap connection. city tap is located in the front left corner of the property and sewer line length is approximately 70 feet long · 97 m away
- 3204 Kerbey LnOct 28, 2026Interior remodel of existing 1-story detached accessory structure: adding 1 full bath · 103 m away
- 3215 Churchill DrJul 9, 2026Replacement of complete existing central heat and air system with or without duct work trane replacement · 104 m away
- 3311 Glenview AveOct 27, 2026Ev charger installation · 108 m away
- 3302 Glenview AveJan 3, 2025Replacement of complete existing central heat and air system with or without duct work · 117 m away
- 3212 Glenview AveAug 25, 2026Eplan: residential expedited review - addition and remodel to existing 1-story single family res. [4bed 4bath] work to include: second floor addition first floor interior remodel patio conversion new beds new baths [5bed 5bath] · 121 m away
- 3308 Glenview AveApr 11, 2024Cut the pv meter tag and remove pv meter so we can connect new #6 to the pv meter as well as completing the interconnection in the ats · 133 m away