Permits filed for a 28 kW whole-home generator
City of Austin permits indicate a 28 kW whole-home generator is being installed at 3313 Stevenson Ave, along with a service-rated transfer switch. The electrical permit was filed November 10, 2025, and a plumbing permit for the generator connection was filed November 14; both records are marked final.
Summarized from City of Austin records · updated Nov 14, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Nov 14, 2025
- since Nov 10, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRun approx 7 of mounted 1 bip + 12 of trenched 1 poly. approx total 19 to generator
- AppliedNov 6, 2025
- IssuedNov 14, 2025
- WorkNov '25 – Jan '26
- Final inspectionJan 22, 2026
Passed final inspection Jan 22, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsRun approx 7 of mounted 1 bip + 12 of trenched 1 poly. approx total 19 to generator
Run approx 7 of mounted 1 bip + 12 of trenched 1 poly. approx total 19 to generator
City of Austin permitPlumbing PermitFinal- Record
- 2025-143409 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of a 200a service-rated automatic transfer switch 28kw whole home generator additional grounding and type 2 surge protection
Installation of a 200a service-rated automatic transfer switch 28kw whole home generator additional grounding and type 2 surge protection
City of Austin permitElectrical PermitFinal- Record
- 2025-143034 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3313 Stevenson Ave
What is being installed at 3313 Stevenson Ave?
City of Austin permits indicate installation of a 28 kW whole-home generator and related electrical and plumbing work. The permits were filed November 10 and 14, 2025.
What size generator is planned for 3313 Stevenson Ave?
The electrical permit describes a 28 kW whole-home generator.
When were permits filed for the generator at 3313 Stevenson Ave?
The electrical permit, 2025-143034 EP, was filed November 10, 2025. The plumbing permit, 2025-143409 PP, was filed November 14, 2025.
What electrical work is included at 3313 Stevenson Ave?
Permit 2025-143034 EP describes a 200-amp service-rated automatic transfer switch, additional grounding, and Type 2 surge protection for the whole-home generator.
Does the permit include a connection to the generator?
Yes. Plumbing permit 2025-143409 PP describes approximately 19 feet of line to the generator, including mounted and trenched sections.
Also being built nearby
All of 78703- 2009 Schulle AveApr 30, 2025Replacement of complete existing central heat and air system with or without duct work · 21 m away
- 2007 Schulle AveApr 9, 2025Replacement of complete existing central heat and air system with or without duct work · 35 m away
- 3309 Stevenson AveAug 3, 2026New pool (581 sq ft) spa (56 sq ft) and concrete decking (205 sq ft) ic at 44.9% · 39 m away
- 2103 Schulle AveFeb 8, 2024Installing evse on 40a circuit · 56 m away
- 2004 Schulle AveApr 30, 2025Replacement of complete existing central heat and air system with or without duct work located in attic · 61 m away
- 3312 Meredith StJun 6, 2024Replacement of complete existing central heat and air system with or without duct work · 67 m away
- 2105 Schulle AveOct 4, 2024Replacement of complete existing central heat and air system with or without duct work · 79 m away
- 3306 Meredith StMar 6, 2024Repair riser and upgrade oh 125 amp service · 91 m away
- 2106 Schulle AveAug 13, 2026Base: installing a backup battery system and additional meter socket · 91 m away
- 2007 Robinhood TrlJul 31, 2026Install level 2 ev charger · 101 m away
- 3315 Gilbert StJun 8, 2026Repair damaged riser and meter hub only (occupied residence/emergency repair) · 101 m away
- 3309 Gilbert StJul 14, 2025Replacement of complete existing central heat and air system with or without duct work · 104 m away