3427 Jefferson Street
Austin, TX 78703 · Doris Enterprises Llc.
Restaurant fit-out and addition registered at 3427 Jefferson Street
A restaurant interior fit-out and 1,000-square-foot addition are planned for the existing building at 3427 Jefferson Street. A TDLR registration filed March 15, 2024, names Postino Wine Cafe and lists a total project scope of 3,950 square feet; the applicant estimated the project cost at $1 million.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 15, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 15, 2024
- since Mar 15, 2024
- Largest scope
- 3,950 sf
- Estimated cost
- $1.0M
- state registration
Where this project stands
Completed1615 W 35th Street LLC
3,950 sq ft · $1.0M est.
- RegisteredMar 15, 2024
- Plan review
- ConstructionJun '24 – Jan '25
- Inspected
- Closed
Ran as a 7-month build.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectNew interior fit out in an existing shell building, with a 1,000 sq ft addition to an existing building for a new restaurant. total scope of work to be 3950 sq ft — postino wine cafe
TDLR project registrationAdditions to Existing BuildingProject Closed3,950 sq ft$1.0M est.- Project #
- TABS2024013925
- Tenant / owner
- 1615 W 35th Street LLC
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3427 Jefferson Street
What is being built at 3427 Jefferson Street in Austin?
A TDLR registration describes a restaurant interior fit-out in an existing building, plus a 1,000-square-foot addition. It names Postino Wine Cafe and lists a 3,950-square-foot total scope.
Is Postino Wine Cafe planned for 3427 Jefferson Street?
The TDLR project registration filed March 15, 2024, identifies Postino Wine Cafe in its description of the restaurant project.
When was the restaurant project at 3427 Jefferson Street filed?
The TDLR registration was filed March 15, 2024. The project is listed as closed in the TDLR record.
How large is the project at 3427 Jefferson Street?
The registration lists a total scope of 3,950 square feet, including a 1,000-square-foot addition to the existing building.
How much is the 3427 Jefferson Street project expected to cost?
The applicant's TDLR estimate is $1 million for the project.
What's being built near 1608 W. 35th Street in Austin?
About 103 meters from 1608 W. 35th Street, the project at 3427 Jefferson Street is described in a TDLR registration as a restaurant fit-out and 1,000-square-foot addition.
Also being built nearby
All of 78703- 3406 Glenview AveAug 12, 2024Replace yard water line and yard sewer line · 24 m away
- 3404 Glenview AveDec 8, 2023Replace 125amp panel like for like · 29 m away
- 3427 Jefferson StJan 29, 2025Postino: sign b · 32 m away
- 1701 W 35th StJul 10, 2026Rr-e04. remove existing signage. install illuminated wall sign with push thru letters · 65 m away
- 3409 Glenview AveSep 24, 2009Gorbet building parking improvements · 75 m away
- 1715 W 35th StDec 1, 2023Change of use from medical to personal improvement services and remodel · 80 m away
- 3411 Glenview AveDec 16, 2025Interior non structural demolition · 87 m away
- 1608 W. 35th Street · 1608 W. 35th StreetMar 16, 2026Interpretive coffee — renovation/alteration — interior renovation of an existing restaurant within a former 1-story residence for use as a coffee bar. work includes minor demolition, new finishes and lighting, and new work area plumbing. existing restroom to receive new lighting and finishes · 103 m away
- 3500 Jefferson StJul 8, 2026Requesting an emergency permit. suite has lost power. will need to replace the faulty main service breaker enclosure · 118 m away
- 1710 W 34th StSep 11, 2024Secondary riser rear of property 10/7/24 sm ** revised. build new service and main panel on house removing rack going underground from secondary riser/ pull box to new meter location · 119 m away
- 1608 W 35th StMay 29, 2026Interior remodel of an existing restaurant use as a coffee bar. work includes minor demolition new finishes and lighting new work area plumbing. existing restroom to receive new lighting and finishes · 126 m away
- 3310 Glenview AveOct 17, 2025Replacement of complete existing central heat and air system with or without duct work scuttle hatch in hallway · 129 m away