3609 Dali Ln
Austin, TX 78703
Like-for-like HVAC replacement at 3609 Dali Ln
A like-for-like replacement of the downstairs central heating and air system was permitted at 3609 Dali Ln on May 18, 2026. The Austin permit describes a 4-ton, two-stage vertical gas system, with or without duct work.
Summarized from City of Austin records · updated May 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 18, 2026
- since May 18, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work like for like: 4 ton two stage vertical gas (downstairs system)
- AppliedMay 12, 2026
- IssuedMay 18, 2026
- WorkMay '26 – Jun '26
- Final inspectionJun 4, 2026
Passed final inspection Jun 4, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work like for like: 4 ton two stage vertical gas (downstairs system)
Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton two stage vertical gas (downstairs system)
City of Austin permitMechanical PermitFinal- Record
- 2026-059384 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3609 Dali Ln
What is being built at 3609 Dali Ln?
The permit is for replacing the existing downstairs central heating and air system, not for a new building. It specifies a like-for-like 4-ton, two-stage vertical gas system.
Is there a new home planned at 3609 Dali Ln?
The available City of Austin record is for a mechanical permit to replace an existing heating and air system. It does not describe a new home.
When was the HVAC replacement at 3609 Dali Ln permitted?
The permit was filed on May 18, 2026. It is City of Austin permit 2026-059384 MP.
What type of HVAC system is being installed at 3609 Dali Ln?
The permit describes a 4-ton, two-stage vertical gas system for the downstairs, replacing the existing central heat and air system.
Does the HVAC replacement at 3609 Dali Ln include new ductwork?
The permit description says the replacement is with or without duct work; it does not specify whether new ductwork is included.
Also being built nearby
All of 78703- 3605 Dali LnNov 5, 2025Add elevator from 1st floor to 3rd floor · 50 m away
- 2610 Kenmore CtApr 14, 2026Addition of office space 1/2 bath outdoor kitchen covered patio trellis and sport court · 86 m away
- 2502 El Greco CvMay 13, 2024Replacement of an existing water heater · 93 m away
- 2503 Velasquez DrNov 24, 2025Install new 12.88 kw dc rooftop solar system and 30.0 kwh energy storage system to existing residential · 96 m away
- 2524 Tanglewood TrlNov 8, 2024New inground spa with heating system. removal of ic to bring the lots overall imperious coverage into compliance · 110 m away
- 2520 Tanglewood TrlOct 7, 2024Request to disconnect existing 200 amp meter can installation of a 200 a ats · 116 m away
- 2504 Velasquez DrFeb 5, 2025Express: replace 3 windows (like for like) · 119 m away
- 2526 Tanglewood TrlMar 7, 2024Build a 300 amp secondary riser for a single family dwelling · 122 m away
- 2505 Velasquez DrNov 16, 2026Replacement of complete existing central heat and air system with or without duct work replacing like for like 3t horz vert · 127 m away
- 2505 El Greco CvNov 17, 2026Base: installing a backup battery system and additional meter socket · 151 m away
- 2528 Tanglewood TrlOct 10, 2025New construction in-ground pool and spa · 159 m away
- 2600 Kenmore CtMar 6, 2024Expedited review - *partial demolition* addition to existing 2-story sfr to include conversion of existing porch into spa addition of cabana and expansion of existing pool terrace [6bed 8.5bath] · 161 m away