506 West Ave
Austin, TX 78703
Residential site plan pending at 506 West Ave
Austin records show a residential site-plan case for 506 West Ave pending as of October 28, 2026. An earlier case filed January 9, 2025, was withdrawn. Separate building and electrical permits for a new 400-amp transocket and disconnect were finalized October 22 and 27, 2025.
Summarized from City of Austin records · updated Oct 28, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Oct 28, 2026
- since Jan 9, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledElectrical service is over 200 amps our stand alone ep: 2025-071638 (description below) was rejected and the meter was removed by austin energy. need building permit for scope of work. (new 400 amp transocket and 400 amp disconnect) [7 day review]
- AppliedJul 29, 2025
- IssuedOct 27, 2025
- WorkOct '25 – Feb '26
- Final inspectionFeb 11, 2026
Passed final inspection Feb 11, 2026.
1 contact on this project · 1 phone number
Permit & project history
4 projectsElectrical service is over 200 amps our stand alone ep: 2025-071638 (description below) was rejected and the meter was removed by austin energy. need building permit for scope of work. (new 400 amp transocket and 400 amp disconnect) [7 day review]
Electrical service is over 200 amps our stand alone ep: 2025-071638 (description below) was rejected and the meter was removed by austin energy. need building permit for scope of work. (new 400 amp transocket and 400 amp disconnect) [7 day review]
City of Austin permitElectrical PermitFinal- Record
- 2025-133110 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Electrical service is over 200 amps our stand alone ep: 2025-071638 (description below) was rejected and the meter was removed by austin energy. need building permit for scope of work. (new 400 amp transocket and 400 amp disconnect) [7 day review]
Electrical service is over 200 amps our stand alone ep: 2025-071638 (description below) was rejected and the meter was removed by austin energy. need building permit for scope of work. (new 400 amp transocket and 400 amp disconnect) [7 day review]
City of Austin permitBuilding PermitFinal- Record
- 2025-133110 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 506 West Ave
What is being planned at 506 West Ave?
A City of Austin case titled “506 West Residential” is pending. The record does not specify the building’s size or design.
Is a residential project planned at 506 West Ave in Austin?
City records show a residential site-plan case, number 13226925, pending as of October 28, 2026.
When was the 506 West Ave site plan filed?
An earlier case was filed January 9, 2025, and later withdrawn. A new case, number 13226925, was recorded October 28, 2026, with pending status.
What electrical work was permitted at 506 West Ave?
Building permit 2025-133110 BP and electrical permit 2025-133110 EP cover a new 400-amp transocket and disconnect. The permits were finalized October 22 and October 27, 2025, respectively.
Is construction underway at 506 West Ave?
The latest site-plan case in the records is pending as of October 28, 2026. The records provided do not confirm whether construction has started.
What is being planned near Public Gardens on West Avenue?
A residential site-plan case is pending at 506 West Ave, about 78 meters from Public Gardens at 800 West 6th Street. The case record does not give a construction schedule.
Also being built nearby
All of 78703- 800 W 5th StDec 4, 2025Replacement of complete existing central heat and air system with or without duct work · 23 m away
- 807 W 6th StMay 12, 2025Intalling 10 smartjacks 5 concrete posts and 22 woodbeam. [qt] · 61 m away
- 507 West AveOct 8, 2024Eplan: expedited review - [approved] interior remodel and change of use from office to cocktail lounge (3000 sq ft) · 63 m away
- 811 W 6th StJun 10, 2024Emergency repair of retaining walls along shoal creek trail between 5th and 6th street · 65 m away
- 501 West AveApr 10, 2026Modify existing service to accommodate future load. no meter work will be required for this project. we will demolition a transformer replace breaker and re-feed a larger transformer and set 1 new panel. hyatt dunn and i spoke about this project in person and i showed him this paperwork and he said it will work · 71 m away
- 800 West 6th Street · Cirrus Logic INCOct 21, 2026Public gardens — renovation/alteration — interior renovations to an existing restaurant tenant finish our project. (9497 sq ft) · 78 m away
- 801 W 5th StJul 21, 2025Installation of a new mini split · 106 m away
- 828 W 6th St. 200May 18, 2026Aus29 — renovation/alteration — minor interior tenant improvement modification to existing office space · 130 m away
- 719 W 6th StFeb 13, 2025-smaller blade sign to replace existing concrete cowboy blade sign · 133 m away
- 718 W 6th StFeb 21, 2025Eplan: expedited review - interior remodel to an existing nightclub/bar (1745 sq ft). work to include open patio space to be enclosed with a new roof and supporting walls · 139 m away
- 605 Wood StMar 2, 2007Wood street parking improvements for gsd&m corporate headquarters · 140 m away
- 716 W 6th St · Marbur Properties INCOct 22, 2024Eplan: expedited review - interior remodel to reduce in size to create separate bar at 718 w 6th st (4651 sq ft) · 141 m away