509 Upson St
Austin, TX 78703
Interior remodel permitted at 509 Upson St
City of Austin permits indicate an interior remodel at 509 Upson St, with partial demolition, two bathrooms being reconfigured, washer and dryer hookups added, and interior walls removed. The building permit was filed April 24, 2026; related plumbing, electrical, and mechanical permits followed through May 27, 2026.
Summarized from City of Austin records · updated May 27, 2026
- Projects
- 5
- 5 filings
- Latest filing
- May 27, 2026
- since Sep 12, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled*partial demolition* interior remodel
- AppliedFeb 25, 2026
- IssuedMay 27, 2026
- WorkMay '26 – Sep '26
- Final inspectionSep 22, 2026
Passed final inspection Sep 22, 2026.
1 contact on this project · 1 phone number
Permit & project history
5 projects*partial demolition* interior remodel
*partial demolition* interior remodel
City of Austin permitMechanical PermitFinal- Record
- 2026-030948 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
*partial demolition* interior remodel
*partial demolition* interior remodel
City of Austin permitElectrical PermitFinal- Record
- 2026-030948 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
*partial demolition* interior remodel
*partial demolition* interior remodel
City of Austin permitPlumbing PermitFinal- Record
- 2026-030948 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
*partial demolition* interior remodel 5/20/2026 im reconfiguring 2 bathrooms and adding washer dryer hook ups removing interior walls
*partial demolition* interior remodel 5/20/2026 im reconfiguring 2 bathrooms and adding washer dryer hook ups removing interior walls
City of Austin permitBuilding PermitFinal- Record
- 2026-030948 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace an existing old overhead service with a new main breaker panel and meter can
Replace an existing old overhead service with a new main breaker panel and meter can
City of Austin permitElectrical PermitFinal- Record
- 2025-114911 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 509 Upson St
What is being built at 509 Upson St?
City of Austin permit filings indicate an interior remodel with partial demolition, two bathrooms being reconfigured, washer and dryer hookups added, and interior walls removed. The records describe remodeling, not a new building.
When was the remodel at 509 Upson St permitted?
The building permit, 2026-030948 BP, was filed April 24, 2026. Related plumbing, electrical, and mechanical permits were filed between April 28 and May 27, 2026.
What work is included in the 509 Upson St remodel?
The building permit description lists partial demolition, reconfiguring two bathrooms, adding washer and dryer hookups, and removing interior walls.
Are the permits for 509 Upson St final?
The listed building, plumbing, electrical, and mechanical permits for the remodel are marked Final. Their permit numbers are 2026-030948 BP, PP, EP, and MP.
Was there other permitted work at 509 Upson St?
A separate electrical permit, 2025-114911 EP, was filed September 12, 2025, to replace an existing overhead electrical service with a new main breaker panel and meter can. It is marked Final.
Also being built nearby
All of 78703- 507 Upson StJan 28, 2009Charles johnson addition, amended plat of lots 2-4, block 4 — charles johnson addition, amended plat of lots 2-4, block 4 · 14 m away
- 511 Upson StJan 10, 2025Replacement of complete existing central heat and air system with or without duct work · 15 m away
- 513 Upson StSep 28, 2010Charles johnson addition, resubdivision of lot 1, block 4 · 33 m away
- 514 Upson StJun 22, 2026New pool · 55 m away
- 514 Atlanta StAug 25, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas system · 56 m away
- 518 Atlanta StNov 21, 2024Changeout water heater to existing resid only · 63 m away
- 2208 Lake Austin BlvdMar 2, 2007Professional building · 66 m away
- 2300 Lake Austin BlvdNov 20, 2025Replace asphalt shingles with gaf timberline hdz shingles · 76 m away
- 2304 Lake Austin BlvdJul 24, 2026Repair of improperly installed gas line at meter. meter pulled and capped. extension of gas line to new connection point with pressure test. work to be completed prior to meter reinstallation by utility · 79 m away
- 513 Deep Eddy AveMar 27, 2026New pool · 97 m away
- 607 Upson StFeb 7, 2025Dig trench in yard to replace water line · 108 m away
- 609 Upson StAug 20, 2025Remove 517 square feet of existing driveway pavement add swimming pool and 69 square feet of pool coping · 120 m away
More demolitions in 78703.