703 Pressler St
Austin, TX 78703
Home upgrades and an EV charger permitted at 703 Pressler St
City of Austin permits cover an EV charging station, replacement windows, and a central heating and air system at 703 Pressler St. The window permit was filed April 10, 2026, followed by the HVAC permit on April 28 and the EV charger permit on April 29. All three permits are marked final.
Summarized from City of Austin records · updated Apr 29, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Apr 29, 2026
- since Apr 10, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstallation of ev charging station
- AppliedApr 25, 2026
- IssuedApr 29, 2026
- WorkApr '26 – May '26
- Final inspectionMay 1, 2026
Passed final inspection May 1, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsInstallation of ev charging station
Installation of ev charging station
City of Austin permitElectrical PermitFinal- Record
- 2026-051362 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work replace 3.5 ton system with 3 ton system (based on heat load) replace all ductwork upstairs according to design
Replacement of complete existing central heat and air system with or without duct work replace 3.5 ton system with 3 ton system (based on heat load) replace all ductwork upstairs according to design
City of Austin permitMechanical PermitFinal- Record
- 2026-052067 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replacing 20 windows
Express: replacing 20 windows
City of Austin permitBuilding PermitFinal- Record
- 2026-044082 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 703 Pressler St
What is being built at 703 Pressler St?
City permits cover home improvements: replacing 20 windows, replacing the central heating and air system and upstairs ductwork, and installing an EV charging station. The records do not describe a new building.
Is a new home being built at 703 Pressler St in Austin?
The available permits describe upgrades to an existing residence, not construction of a new home. They cover windows, HVAC equipment and ductwork, and an EV charging station.
Is there an EV charger permit for 703 Pressler St?
Yes. City of Austin electrical permit 2026-051362 EP, filed April 29, 2026, covers installation of an EV charging station and is marked final.
What work is planned for the HVAC system at 703 Pressler St?
Mechanical permit 2026-052067 MP, filed April 28, 2026, covers replacement of the existing central heat and air system with a 3-ton system and replacement of upstairs ductwork. The permit is marked final.
How many windows are being replaced at 703 Pressler St?
Building permit 2026-044082 BP covers replacement of 20 windows. It was filed April 10, 2026, and is marked final.
Also being built nearby
All of 78703- 615 Pressler StJun 18, 2024Replacement of complete existing central heat and air system with or without duct work · 33 m away
- 706 Winflo DrJul 20, 2026Interior remodel of a single-family residence. 6/17/26 sm - revised ** cosmetic upgrade to bathroom (with a new shower pan) to be done near finals. update utility room new washer box and dryer exhaust penetration relocate cooking from old island to wall new island multiple new branch circuits for lighting and a couple receptacles update all devices · 37 m away
- 802 Winflo DrDec 12, 2024Replacement of complete existing central heat and air system with or without duct work 5 ton gas greenspeed system · 45 m away
- 704 Winflo DrAug 23, 2024Replacement of complete existing central heat and air system with or without duct work · 48 m away
- 804 Winflo DrJul 29, 2017Winflo townhomes · 56 m away
- 809 Pressler StAug 27, 2026Interior remodel - addition of 1 bathroom to primary kitchen remodel bar addition. continuation of 2026-076087 pr · 61 m away
- 702 Winflo DrOct 12, 2026Total demolition of sfr 1350 sq ft circa 1953 and pool 1250 sq ft circa 2011 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 64 m away
- 614 Pressler StOct 5, 2024Replacement of 2 complete existing central heat and air system with or without duct work · 71 m away
- 806 Winflo DrFeb 24, 2026Excavate 15 tunnel to repair main drain line under house · 75 m away
- 703 Oakland AveOct 26, 2026Addition/remodel. addition to rear of existing 2-story duplex to consist of adding 1 bedroom 1 bathroom dining/living room screened balconies and uncovered balconies to each unit of the duplex. new workshop with covered patio below the 1st floor. unit a will result in a total of 2 bedrooms and 2 bathrooms · 100 m away
- 801 Winflo DrNov 19, 2024Expedited review: new construction of a 2-story single family res [6bed 6.5bath] with attached 2-car garage · 101 m away
- 712 Brownlee CirFeb 21, 2025Replacement of complete existing central heat and air system with or without duct work · 107 m away