1019 W Milton St
Austin, TX 78704
Permit filed for backup battery system at 1019 W Milton St
An electrical permit filed October 6, 2026, covers installation of a backup battery system and an additional meter socket at 1019 W Milton St. The City of Austin lists the permit as active.
Summarized from City of Austin records · updated Oct 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 6, 2026
- since Oct 6, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayBase: installing a backup battery system and additional meter socket
- AppliedSep 21, 2026
- IssuedOct 6, 2026
- WorkOct '26 – Apr '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectBase: installing a backup battery system and additional meter socket
Base: installing a backup battery system and additional meter socket
City of Austin permitElectrical PermitActive- Record
- 2026-124205 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1019 W Milton St
What is being installed at 1019 W Milton St?
The permit description says the work includes a backup battery system and an additional meter socket.
When was the permit for 1019 W Milton St filed?
The City of Austin permit was filed October 6, 2026.
What is the permit number for 1019 W Milton St?
The permit number is 2026-124205 EP.
Is the 1019 W Milton St permit active?
Yes. The City of Austin lists permit 2026-124205 EP as active.
What type of permit was issued for 1019 W Milton St?
It is an electrical permit for a backup battery system and an additional meter socket.
Also being built nearby
All of 78704- 1021 W Milton StDec 4, 2024Replacement of complete existing central heat and air system with or without duct work · 16 m away
- 1017 W Milton StFeb 9, 2026Unit a - replacement of mini-split system new mini split system installation · 24 m away
- 1018 W Milton StJul 24, 2026Install additional 1.84 kw dc rooftop solar system to existing residential · 36 m away
- 1014 W Milton StDec 3, 2023Replacement of an existing water heater · 46 m away
- 1012 W Milton StJun 26, 2026Rack permit · 59 m away
- 1007 W Milton StNov 14, 2023Replace 200-amp service to a 300-amp service · 91 m away
- 1006 W Milton StJan 15, 2025Request to disconnect -installation of new service rated generac transfer switch and generator. this will require disconnecting and reconnecting power. the transfer switch will be placed between the meter and existing house panel. 200 amp service with 200 amp ats · 95 m away
- 1101 W Monroe StFeb 2, 2026Replace tankless water heater · 102 m away
- 1705 S 6th StSep 3, 2026Build temporary service for construction. ref: 2026-101787-bp · 103 m away
- 1709 S 6th StMar 27, 2024Seperate gas meter · 126 m away
- 1104 W Monroe StJul 17, 2025Replacement of mini-split system install new minisplit · 132 m away
- 1106 W Monroe StAug 13, 2024In ground swimming pool with required enclosure device · 133 m away