111 Congress Avenue L19
Austin, TX 78704 · Cousins-One Congress Plaza LLC
Restroom renovation registered at 111 Congress Avenue
A 354-square-foot restroom renovation at 111 Congress Avenue updates finishes, with fixture counts staying the same. The project was registered with the Texas Department of Licensing and Regulation on July 25, 2025, and is listed as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 25, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 25, 2025
- since Jul 25, 2025
- Largest scope
- 354 sf
- Estimated cost
- $300K
- state registration
Where this project stands
Completed111 Congress L19 Restroom
354 sq ft · $300K est.
- RegisteredJul 25, 2025
- Plan review
- ConstructionAug '25 – Feb '26
- Inspected
- Closed
Ran as a 7-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRestroom renovation, updating finishes - fixture counts remained the same. — one congress plaza
TDLR project registrationRenovation/AlterationProject Closed354 sq ft$300K est.- Project #
- TABS2025024411
- Tenant / owner
- 111 Congress L19 Restroom
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 111 Congress Avenue L19
What is being built at 111 Congress Avenue in Austin?
A restroom is being renovated at 111 Congress Avenue L19. The project description says finishes are being updated and fixture counts remain the same.
When was the 111 Congress Avenue restroom renovation registered?
It was registered on July 25, 2025, under TDLR project number TABS2025024411. The project is listed as closed.
How large is the restroom renovation at 111 Congress Avenue?
The registered project covers 354 square feet.
Is a new restroom being added at 111 Congress Avenue?
The project record describes a restroom renovation and says fixture counts remained the same. It does not indicate that additional fixtures are being added.
What is being renovated near Rivian Lone Tar Holdings on South Congress?
At 111 Congress Avenue L19, about 84 meters from the listed Rivian Lone Tar Holdings landmark, a 354-square-foot restroom renovation updates finishes. The TDLR registration was filed July 25, 2025.
Also being built nearby
All of 78704- 208 S Congress Avenue · Rivian Lone Tar Holdings, LLCNov 19, 2025Rivian austin hub exterior stair — new construction — add a new exterior stair · 84 m away
- 208 S Congress AveMar 2, 20262026/03/12 - 2026/03/18 | (2026/03/06) | rivian event and activations for sxsw 2026 events · 110 m away
- 208 Congress AveMar 11, 2026Austin rivian hub · 110 m away
- 208 Barton Springs RdMar 11, 2026Repair grease line for grease trap located on ground floor back of the building near loading dock · 127 m away
- 220 S Congress Ave · 220 S. CongressJul 8, 2026Duck camp - led projecting sign - 48 x 107 · 142 m away
- 208-1/2 Barton Springs RdJul 19, 2011Hyatt regency lady bird lake boat dock · 154 m away
- 127 S 1st StMay 22, 2026Eplan: expedited review - first time finish out for units · 199 m away
- 125 S 1st StMay 22, 2026Eplan: expedited review - first time finish out for units · 213 m away
- 208 Barton Springs · Hhr Austin LLCDec 28, 2023Hyatt austin regency downtown - new raised pool deck — renovation/alteration — construction of a new raised pool deck adjacent to the existing pool deck · 228 m away
- 208 Barton Springs Road · Hhr Austin LLCDec 12, 2024Hyatt regency austin guestroom renovation — renovation/alteration — soft & casegoods renovation of existing 449 quest rooms. reconfigure accessible guest bathrooms & minor living area to meet current accessibility requirements. one presidential suite will be converted to 2 guest rooms & 1 suite. 188,000 sq ft · 228 m away
- 210 Barton Springs RdOct 15, 2014210 barton springs (a.k.a sp-00-2599c) · 237 m away
- 305 S Congress Ave · 305 South Congress LPSep 29, 2026Electrical wiring of bf1 new scope as follows: scope of work: - provide and install (1) 600a mcb 480/277y 3ph 4w panel chfdp in the cortex area - run conduit and with from panel 1dha2 to provide (1) 600a 480v aluminum feed for panel chfdp - provide and install (1) 600a mcb240/120v 1ph 3w panel ahet in the cortex area - install (1) 150kva 480v to 208/120y transformer (transformer supplied by base power) - run conduit and wire from panel chfdp to provide (1) 400a 480v 1ph feed to the transformer - run conduit and wire from the transformer to provide (1) 600a 240/120v 1ph 3w feed to panel ahet - install (6) 110a 240v 1ph 3w feeds for xe9780l air-cooled server and hitl. fed from panel ahet - install (10) 20a 120v outlets for control + bench - install (4) 40a 480v 3ph twist-lock outlets for forklift chargers fed from panel chfdp · 241 m away