groundranger
Historic · latest filing Oct 2024Residential

1120 Reagan Ter

Austin, TX 78704

1120 Reagan Ter: 1 project on record

City of Austin lists 1 filing across 1 project at 1120 Reagan Ter, Austin, TX 78704. The most recent, filed October 9, 2024, covers: “Diy grid-tied residential solar project 8 panels 3.2kw dc 1x 20a branch of enphase microinverters 2.3kw ac flat roof 5-degree tilt ballast racking not visible from the street”.

Compiled from City of Austin records · updated Oct 9, 2024

Projects
1
1 filings
Latest filing
Oct 9, 2024
since Oct 9, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit expired

Diy grid-tied residential solar project 8 panels 3.2kw dc 1x 20a branch of enphase microinverters 2.3kw ac flat roof 5-degree tilt ballast racking not visible from the street

  1. AppliedOct 3, 2024
  2. IssuedOct 9, 2024
  3. !WorkOct '24 – Oct '25
  4. Final inspection

Marked expired Jul 13, 2026.

Permit & project history

1 project
  1. Diy grid-tied residential solar project 8 panels 3.2kw dc 1x 20a branch of enphase microinverters 2.3kw ac flat roof 5-degree tilt ballast racking not visible from the street

    Diy grid-tied residential solar project 8 panels 3.2kw dc 1x 20a branch of enphase microinverters 2.3kw ac flat roof 5-degree tilt ballast racking not visible from the street

    City of Austin permitElectrical PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1120 Reagan Ter

What is being built at 1120 Reagan Ter?

The latest filing (City of Austin permit 2024-133885 EP, October 9, 2024) covers diy grid-tied residential solar project 8 panels 3.2kw dc 1x 20a branch of enphase microinverters 2.3kw ac flat roof 5-degree tilt ballast racking not visible from the street.

How many permits and filings does 1120 Reagan Ter have?

1 filing across 1 project, from October 9, 2024 to October 9, 2024.

Is there other construction near 1120 Reagan Ter?

Yes. Nearby filings include 1116 Reagan Ter (replace sewer yard line. main sewer line starting roughly 6 feet in front of the backyard clean out going 75 to 80 feet all the way to the city tap, Nov 17, 2025); 1121 Reagan Ter (new construction of detached garage, Sep 15, 2026); 1115 Reagan Ter (install level 2 ev charger, May 28, 2025).

How do I get alerts for new permits at 1120 Reagan Ter?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78704

More solar installs in 78704.

Email me when a new permit is filed