1120 Reagan Ter
Austin, TX 78704
1120 Reagan Ter: 1 project on record
City of Austin lists 1 filing across 1 project at 1120 Reagan Ter, Austin, TX 78704. The most recent, filed October 9, 2024, covers: “Diy grid-tied residential solar project 8 panels 3.2kw dc 1x 20a branch of enphase microinverters 2.3kw ac flat roof 5-degree tilt ballast racking not visible from the street”.
Compiled from City of Austin records · updated Oct 9, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 9, 2024
- since Oct 9, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredDiy grid-tied residential solar project 8 panels 3.2kw dc 1x 20a branch of enphase microinverters 2.3kw ac flat roof 5-degree tilt ballast racking not visible from the street
- AppliedOct 3, 2024
- IssuedOct 9, 2024
- !WorkOct '24 – Oct '25
- Final inspection
Marked expired Jul 13, 2026.
Permit & project history
1 projectDiy grid-tied residential solar project 8 panels 3.2kw dc 1x 20a branch of enphase microinverters 2.3kw ac flat roof 5-degree tilt ballast racking not visible from the street
Diy grid-tied residential solar project 8 panels 3.2kw dc 1x 20a branch of enphase microinverters 2.3kw ac flat roof 5-degree tilt ballast racking not visible from the street
City of Austin permitElectrical PermitExpired- Record
- 2024-133885 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1120 Reagan Ter
What is being built at 1120 Reagan Ter?
The latest filing (City of Austin permit 2024-133885 EP, October 9, 2024) covers diy grid-tied residential solar project 8 panels 3.2kw dc 1x 20a branch of enphase microinverters 2.3kw ac flat roof 5-degree tilt ballast racking not visible from the street.
How many permits and filings does 1120 Reagan Ter have?
1 filing across 1 project, from October 9, 2024 to October 9, 2024.
Is there other construction near 1120 Reagan Ter?
Yes. Nearby filings include 1116 Reagan Ter (replace sewer yard line. main sewer line starting roughly 6 feet in front of the backyard clean out going 75 to 80 feet all the way to the city tap, Nov 17, 2025); 1121 Reagan Ter (new construction of detached garage, Sep 15, 2026); 1115 Reagan Ter (install level 2 ev charger, May 28, 2025).
How do I get alerts for new permits at 1120 Reagan Ter?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 1116 Reagan TerNov 17, 2025Replace sewer yard line. main sewer line starting roughly 6 feet in front of the backyard clean out going 75 to 80 feet all the way to the city tap · 31 m away
- 1121 Reagan TerSep 15, 2026New construction of detached garage · 47 m away
- 1115 Reagan TerMay 28, 2025Install level 2 ev charger · 60 m away
- 1123 Reagan TerMar 5, 2026Express: siding replacement with hardiplank direct window replacement with double pane windows · 63 m away
- 1112 Reagan TerOct 28, 2026Base: installing a backup battery system and additional meter socket · 71 m away
- 1508 Chelsea LnJun 11, 2025Interior remodel remodel 2 bathrooms redesign kitchen install cabinets flooring doors windows repair drywall paint · 78 m away
- 1111 Reagan TerJan 27, 2025Express: installing piles on the exterior perimeter wall and leveling the back of the house to the extent of the structure · 81 m away
- 1108 Reagan TerNov 25, 2025Replacement of complete existing central heat and air system with or without duct work lacey caruso · 88 m away
- 1109 Reagan TerOct 22, 2024Express: window replacement (one window like for like) door replacement (one door like for like exempt) · 96 m away
- 1106 Reagan TerOct 8, 2025Express: replace 13 windows like for like · 104 m away
- 1107 Reagan TerAug 14, 2024Replacement of complete existing central heat and air system with or without duct work · 110 m away
- 1516 Chelsea LnNov 21, 2024Expedited review - new construction of a 2-story guest house [1bed 2bath] · 126 m away
More solar installs in 78704.