119 Coleman St
Austin, TX 78704
119 Coleman St: 1 project on record
City of Austin lists 1 filing across 1 project at 119 Coleman St, Austin, TX 78704. The most recent, filed May 27, 2024, covers: “Replacement of complete existing central heat and air system”.
Compiled from City of Austin records · updated May 27, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 27, 2024
- since May 27, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system
- AppliedMay 23, 2024
- IssuedMay 27, 2024
- WorkMay '24 – Sep '24
- Final inspectionSep 25, 2024
Passed final inspection Sep 25, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system
Replacement of complete existing central heat and air system
City of Austin permitMechanical PermitFinal- Record
- 2024-065119 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 119 Coleman St
What is being built at 119 Coleman St?
The latest filing (City of Austin permit 2024-065119 MP, May 27, 2024) covers replacement of complete existing central heat and air system.
How many permits and filings does 119 Coleman St have?
1 filing across 1 project, from May 27, 2024 to May 27, 2024.
Is there other construction near 119 Coleman St?
Yes. Nearby filings include 121 Coleman St (replacement of complete existing central heat and air system with or without duct work, Nov 29, 2023); 120 Frederick St (interior remodel of primary bath. relocating vanity plumbing and electrical. enlarging kitchen sq ft slightly. enlarge kitchen window and replace wh with tankless, Dec 11, 2023); 3116 S Congress Ave (install new 200a overhead meter loop for food trailer in parking lot, Mar 13, 2025).
How do I get alerts for new permits at 119 Coleman St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 121 Coleman StNov 29, 2023Replacement of complete existing central heat and air system with or without duct work · 14 m away
- 120 Frederick StDec 11, 2023Interior remodel of primary bath. relocating vanity plumbing and electrical. enlarging kitchen sq ft slightly. enlarge kitchen window and replace wh with tankless · 41 m away
- 3116 S Congress AveMar 13, 2025Install new 200a overhead meter loop for food trailer in parking lot · 63 m away
- 3116 Congress AveFeb 26, 2010Crow bar; the · 63 m away
- 126 Frederick StNov 12, 2026Addition/remodel. retroactively permit addition of an expanded living room and uncovered wood deck to rear of existing 1-story single family residence. replace framing and reinstall windows due to termite damage · 64 m away
- 3208 S Congress AveNov 4, 2026Change of use to liquor store with remodel · 75 m away
- 3114 S Congress AveJun 6, 2025Replacement of an existing water heater · 79 m away
- 3114 Congress AveFeb 25, 2015South congress residential · 79 m away
- 130 Frederick StFeb 22, 2024Replace overhead electrical service panel (200 amps) · 90 m away
- 3110 Congress AveSep 17, 20083110 south congress · 90 m away
- 117 Havana StOct 1, 2025New inground pool with reqd enclosure device for existing 1-story sfr · 95 m away
- 125 Frederick StMay 20, 202662 feet of subfloor tunnel and a complete cast iron re-pipe. sewer yard line replacement. the residence has two bathrooms kitchen sink and a washer box. no gas work or domestic water work will be performed. all fixtures will remain in their current configuration. the sewer yard line will be replaced all the way to the city tap. the city tap is updated and we will tie in just before it · 104 m away