1200 Gibson St
Austin, TX 78704
“Saving Face” site plan approved at 1200 Gibson St
An Austin site plan case named “Saving Face” at 1200 Gibson St was approved and released on Aug. 27, 2025. The record does not specify the project’s use, size, or construction details.
Summarized from City of Austin records · updated Aug 27, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 27, 2025
- since Aug 27, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 1200 Gibson St
What is being built at 1200 Gibson St in Austin?
A City of Austin site plan case named “Saving Face” was approved and released on Aug. 27, 2025. The record does not describe what is being built.
What is the “Saving Face” project in Austin?
“Saving Face” is the name listed for site plan case 13256758 at 1200 Gibson St. The case was approved and released on Aug. 27, 2025.
Is the 1200 Gibson St project approved?
Yes. The City of Austin case is listed as “Approved and Released,” dated Aug. 27, 2025.
Is a restaurant opening at 1200 Gibson St?
The available site plan record does not identify the project as a restaurant or name an occupant.
What’s being planned near The Collective on South Lamar?
A site plan case named “Saving Face” at 1200 Gibson St, about 91 meters from The Collective, was approved and released on Aug. 27, 2025. The record does not provide further project details.
What’s planned near the Alamo Drafthouse on South Lamar?
The “Saving Face” site plan at 1200 Gibson St, about 188 meters from the Alamo Drafthouse, was approved and released on Aug. 27, 2025. The record does not state the project’s use.
Also being built nearby
All of 78704- 1200 West Gibson Street · Same Same LLCDec 17, 2024Saving face — new construction — 4-story medical office building · 26 m away
- 1109 Lamar BlvdApr 21, 2009Big chief no. two · 38 m away
- 1112 S. 8th St · Saving Face AustinMay 16, 2024Saving face — new construction — 4-story, 8500 sq ft practice, parking at grade with concrete podium construction at level 1 and type v-a on levels 2-4 · 50 m away
- 1201-1/2 Lamar BlvdDec 6, 2011South lamar blvd. waterline improvement plans · 59 m away
- 1201 Lamar BlvdJan 12, 2012Gibson retail · 64 m away
- 1215 Lamar BlvdFeb 9, 2015Odd duck late hours permit · 83 m away
- 1100 S Lamar Blvd Bdlg 2 · Fhf I Lamar Union LLCAug 28, 2025Ciccio bomba — renovation/alteration — interior remodel for restaurant · 91 m away
- 1100 S Lamar · Fhf I Lamar Union LLCMar 21, 2026The collective — renovation/alteration — relocation of shampoo chairs and stylist chairs, construction of new demising wall, electrical and mechanical service split 2900 sq ft · 91 m away
- 1219 S Lamar BlvdJul 22, 2026Northwest stucco-clad shear wall repair · 111 m away
- 1219 Lamar BlvdDec 5, 2011Gibson residences · 111 m away
- 1221 S Lamar BlvdOct 22, 2025At&t proposes to -tower sow: remove; (3) rrus (6) diplexers (6) coax decom.; (3) rrus. relocate; (3) air antennas (4) squids. install; (3) air antennas (3) radios (3) dual radio brackets. install mount modification per plans ground sow: remove; (6) -48v/+24v converters (12) powerwave diplexers. install; (1) 48v battery rack (1) 58v retrofit kit (5) -48v/-58v converters install (48) 170ah batteries install (6) 50 · 124 m away
- 1142 Lamar BlvdSep 22, 2009Highball; the (late hours permit) · 140 m away