1212 W Ben White Blvd Svrd Wb
Austin, TX 78704
Vehicle-damaged wall repairs at 1212 W Ben White Blvd
City of Austin permits show repairs to a non-structural interior and exterior wall damaged by a vehicle at 1212 W Ben White Blvd. The building permit was filed December 12, 2023, and the electrical permit was filed December 19, 2023; both are marked final.
Summarized from City of Austin records · updated Dec 19, 2023
- Projects
- 2
- 2 filings
- Latest filing
- Dec 19, 2023
- since Dec 12, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRepair non-structural interior and exterior wall damaged by a vehicle
- AppliedDec 1, 2023
- IssuedDec 19, 2023
- WorkDec '23 – Jan '24
- Final inspectionJan 17, 2024
Passed final inspection Jan 17, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsRepair non-structural interior and exterior wall damaged by a vehicle
Repair non-structural interior and exterior wall damaged by a vehicle
City of Austin permitElectrical PermitFinal- Record
- 2023-156162 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Repair non-structural interior and exterior wall damaged by a vehicle
Repair non-structural interior and exterior wall damaged by a vehicle
City of Austin permitBuilding PermitFinal- Record
- 2023-156162 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1212 W Ben White Blvd Svrd Wb
What is happening at 1212 W Ben White Blvd?
City of Austin permits describe repairs to a non-structural interior and exterior wall damaged by a vehicle. The building and electrical permits are both marked final.
When were the repairs at 1212 W Ben White Blvd permitted?
The building permit, 2023-156162 BP, was filed December 12, 2023. The electrical permit, 2023-156162 EP, was filed December 19, 2023.
What do permits 2023-156162 BP and 2023-156162 EP cover?
Both describe repairs to a non-structural interior and exterior wall damaged by a vehicle. The building permit was filed December 12, 2023, and the electrical permit December 19, 2023.
Is new construction planned at 1212 W Ben White Blvd?
The permits listed for this address cover wall repairs, not new construction. Both repair permits are marked final.
What work is happening near HCFD at 1221 W Ben White Blvd?
At 1212 W Ben White Blvd, City of Austin permits describe repairs to a non-structural interior and exterior wall damaged by a vehicle. The permits were filed in December 2023 and are marked final.
Also being built nearby
All of 78704- 1212 Ben White Blvd SvrdMar 2, 2007Ramada inn south- oak inn
- 1112 W Ben White Blvd Svrd WbOct 27, 2026188 sq ft of level 2 interior renovations to create new suite 210 for medical office use a c.o. is requested for this suite · 75 m away
- 4009 Banister LnOct 16, 2026Banister multifamily · 79 m away
- 1300 Morgan LnFeb 1, 2017Luke's corner (with r of c8-2014-0240.0a) · 91 m away
- 1302 Morgan LnDec 8, 2025Eplan: residential expedited review - new construction of a 2-story single family res. [3bed 3bath] with attached garage/carport. building 3 · 105 m away
- 1221 W Ben White Blvd · Hcfd (healthcare Facilities Development)Sep 24, 2025Hcfd accounting office reno — renovation/alteration — renovation to an existing dentist facility to become an accounting office suite for hcfd and reconfiguring the layout to support their needs · 137 m away
- 4004 Banister LnJan 21, 2022Mesa multifamily · 138 m away
- 1112 W Ben White 2nd · Doctorland Ben White LLCMay 26, 20261112 w ben white 2nd floor — renovation/alteration — interior remodel of approx. 7,390 sq ft · 150 m away
- 1112 W Ben White · Doctorland Ben White, PllcJul 16, 2025Bone drs orthopedic - physical therapy — renovation/alteration — approximately 1,554 sq ft of interior renovations · 150 m away
- 1308 Morgan LnSep 1, 2010Banister heights; resubdivision of the south 1/2 of lot 19 · 161 m away
- 1221 W Ben White Blvd Svrd EbDec 15, 2025Interior renovation tenant finish out - 3k sq ft of space that is currently a dentist office · 180 m away
- 1221 Ben White Blvd SvrdDec 24, 2018Oak knoll phase iii and iv · 180 m away