1305 The Circle
Austin, TX 78704
1305 The Circle: 2 projects on record
City of Austin lists 2 filings across 2 projects at 1305 The Circle, Austin, TX 78704 since December 5, 2023. The most recent, filed December 6, 2023, covers: “Installation of a gas line to a generator”.
Compiled from City of Austin records · updated Dec 6, 2023
- Projects
- 2
- 2 filings
- Latest filing
- Dec 6, 2023
- since Dec 5, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstallation of a gas line to a generator
- AppliedDec 5, 2023
- IssuedDec 6, 2023
- WorkDec '23 – Jan '24
- Final inspectionJan 2, 2024
Passed final inspection Jan 2, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstallation of a gas line to a generator
Installation of a gas line to a generator
City of Austin permitPlumbing PermitFinal- Record
- 2023-155219 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of a generator and automatic transfer switch
Installation of a generator and automatic transfer switch
City of Austin permitElectrical PermitFinal- Record
- 2023-154238 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1305 The Circle
What is being built at 1305 The Circle?
The latest filing (City of Austin permit 2023-155219 PP, December 6, 2023) covers installation of a gas line to a generator.
How many permits and filings does 1305 The Circle have?
2 filings across 2 projects, from December 5, 2023 to December 6, 2023.
Is there other construction near 1305 The Circle?
Yes. Nearby filings include 1307 The Circle (installation of a gas line to a generator, Dec 6, 2023); 1309 The Circle (express: readjust and reshim 321 sq ft, Oct 2, 2026); 1301 Hillside Ave (install generator and transfer switch, Jun 28, 2024).
How do I get alerts for new permits at 1305 The Circle?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 1307 The CircleDec 6, 2023Installation of a gas line to a generator · 23 m away
- 1309 The CircleOct 2, 2026Express: readjust and reshim 321 sq ft · 38 m away
- 1301 Hillside AveJun 28, 2024Install generator and transfer switch · 42 m away
- 1303 Hillside AveMar 11, 2026Replacement of an existing water heater moving an existing tankless water heater from one location on wall to just 3ft away around on to another wall right around the corner from where its currently located · 61 m away
- 1227 Hillside AveAug 11, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas · 64 m away
- 1308 Hillside AveMay 15, 2024Replacement of complete existing central heat and air system with or without duct work · 67 m away
- 1403 Drake AveNov 10, 2025Gas leak repair throughout apartment fourplex · 70 m away
- 1305 Hillside AveFeb 23, 2026New construction of accessory use to primary with pool · 76 m away
- 1400 Hillside AveNov 15, 2023Replacement of mini-split system · 87 m away
- 1225 Hillside AveDec 2, 2016Hillside condominiums · 90 m away
- 1407 Drake AveJul 14, 2026Replacement of an existing water heater · 115 m away
- 1318 Newning AveAug 31, 2026Express- replace 25 windows like for like in existing · 147 m away