1314 Kenwood Ave
Austin, TX 78704
Permits cover sewer and main drain repairs
City of Austin permits cover rerouting the home’s main sewer line and excavating beneath the house to repair its main drain line. The sewer-line permit was finalized on April 8, 2026, and the drain-repair permit was active as of September 22, 2026.
Summarized from City of Austin records · updated Sep 22, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Sep 22, 2026
- since Apr 8, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayExcavate 15 tunnel to repair main drain line under house
- AppliedSep 17, 2026
- IssuedSep 22, 2026
- WorkSep '26 – Apr '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
3 projectsExcavate 15 tunnel to repair main drain line under house
Excavate 15 tunnel to repair main drain line under house
City of Austin permitPlumbing PermitActive- Record
- 2026-122486 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Reroute main building sewer line from back of home to city tap on property line at front corner of home
Reroute main building sewer line from back of home to city tap on property line at front corner of home
City of Austin permitPlumbing PermitFinal- Record
- 2026-022943 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitExpired- Record
- 2023-138829 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1314 Kenwood Ave
What is being built at 1314 Kenwood Ave?
The permits describe plumbing work at the home, not a new building: rerouting the main sewer line and repairing the main drain line beneath the house.
What plumbing work is permitted at 1314 Kenwood Ave?
Permit 2026-022943 PP covers rerouting the main building sewer line to the city tap at the property line. Permit 2026-122486 PP covers excavation to repair the main drain line under the house.
When were the permits filed for 1314 Kenwood Ave?
The sewer-line permit was filed on April 8, 2026, and finalized. The drain-line repair permit was filed on September 22, 2026, and was listed as active.
Is a new home being built at 1314 Kenwood Ave?
The available City of Austin permits describe sewer and drain-line repairs, not construction of a new home.
What is permit 2026-122486 PP for in Austin?
The City of Austin permit describes excavation to repair the main drain line under the house at 1314 Kenwood Ave. It was filed on September 22, 2026, and listed as active.
Also being built nearby
All of 78704- 1316 Kenwood AveAug 5, 2025Addition - addition to rear of home - new unconditioned sun room 132 sq ft · 25 m away
- 1310 Kenwood AveJun 29, 2026New inground exercise spa with cold plunge and required enclosure (heater or autofill) · 30 m away
- 1315 Kenwood AveSep 15, 2025Replacement of complete existing central heat and air system with or without duct work 1 system: 2 ton friedrich 14 seer heat pump · 49 m away
- 1026 Bonham TerDec 18, 2023Replacement of mini-split system · 51 m away
- 1024 Bonham TerMar 4, 2025Replacement of complete existing central heat and air system with or without duct work installing 3.5 ton trane gas horizontal system · 63 m away
- 1011 Milam PlAug 12, 2025Replacement of complete existing central heat and air system with or without duct work upstairs system only · 64 m away
- 1305 Kenwood AveApr 8, 2024Replacement of an existing water heater - remove existing water heater and install new 40 gallon 6yr gas water heater - this is a like for like swap · 100 m away
- 1015 Avondale RdJun 11, 2024Express: replace siding · 110 m away
- 1003 Milam PlMar 11, 2026Replacement of complete existing central heat and air system with or without duct work primary bedroom system & upstairs bedroom system (2 out of 3 systems) · 111 m away
- 1306 Bonham TerJun 4, 2025Express - 3 windows - like for like · 127 m away
- 1327 Bonham TerMay 29, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 3 ton heat pump system · 129 m away
- 1001 Avondale RdAug 10, 2026Replacement of complete existing central heat and air system with or without duct work install 2.5 ton complete heat pump system · 135 m away