1411 W Ben White Blvd
Austin, TX 78704 · Discount Tire, Discount Tire#sap 1177 Txa 01
Discount Tire renovation and storage addition in Austin
TDLR records indicate renovation work at the multi-tenant commercial site at 1411 W Ben White Blvd, including a 1,000-square-foot Discount Tire renovation filed June 12, 2024. A proposed 413-square-foot addition for dead tire storage was registered March 6, 2025.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 6, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Mar 6, 2025
- since Jun 12, 2024
- Largest scope
- 1,000 sf
- Estimated cost
- $498K
- state registration
Where this project stands
In state plan reviewDISCOUNT TIRE
413 sq ft · $100K est.
- RegisteredMar 6, 2025
- Plan reviewnow
- ConstructionApr '25 – Jul '25
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 1 phone number
Permit & project history
2 projectsProposed 413 sqf addition dead tire storage — discount tire
TDLR project registrationAdditions to Existing BuildingProject Registered413 sq ft$100K est.- Project #
- TABS2025013543
- Tenant / owner
- Discount Tire
- Design firm
- Pro
- Contact
- Pro
Renovation of an existing discount tire location - sq ft 1,000 — discount tire
TDLR project registrationRenovation/AlterationInspection Complete1,000 sq ft$498K est.- Project #
- TABS2024020663
- Tenant / owner
- Discount Tire#sap 1177 Txa 01
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1411 W Ben White Blvd
What is being built at 1411 W Ben White Blvd?
TDLR records list a proposed 413-square-foot addition for dead tire storage at the Discount Tire location. The addition was registered March 6, 2025, under project number TABS2025013543.
Is Discount Tire opening at 1411 W Ben White Blvd?
The records describe renovation work at an existing Discount Tire location, not a new opening. The 1,000-square-foot renovation was filed June 12, 2024, under project number TABS2024020663.
How large is the proposed tire storage addition?
The proposed addition is 413 square feet, according to the TDLR registration dated March 6, 2025.
When was the Discount Tire renovation filed?
The 1,000-square-foot renovation was filed with TDLR on June 12, 2024. Its project number is TABS2024020663, and the record status is Inspection Complete.
Has the 413-square-foot addition been completed?
The TDLR record shows the addition was registered on March 6, 2025, with the status Project Registered. It does not establish that the work has been completed.
Is 1411 W Ben White Blvd a single-tenant site?
The site is identified as multi-tenant in the available records. The TDLR filings describe Discount Tire renovation and addition work at the location.
Also being built nearby
All of 78704- 1405-1/2 Ben White Blvd SvrdJul 29, 2026Ben white parking lot expansion · 38 m away
- 4312 Gillis StreetOct 4, 2024The voorhes renovation — renovation/alteration — interior renovation of existing videography studio · 48 m away
- 1411 Ben White Blvd SvrdMar 2, 2007Discount tire company of texas · 63 m away
- 1411 W Ben White Blvd Svrd EbJan 29, 2025Run a line from the building to power the temporary office trailer · 63 m away
- 4312 Gillis StMay 20, 2025Interior renovation relocating a few interior walls and adding more outlets · 86 m away
- 1408-1/2 Ben White Blvd SvrdMar 2, 2007Clarke kent plumbing · 106 m away
- 4315 Gillis StNov 17, 2026Auto tek at gillis · 122 m away
- 1400 Ben White Blvd SvrdJun 7, 2011Athena montessori school · 132 m away
- 1414 W Ben White Blvd Svrd WbOct 21, 2025Re-pull stolen wire from main disconnect to serve back building currently no use empty building. no meter work being done panel open replace secondary wires. per ec 9/15/2025 · 140 m away
- 4400 Gillis StNov 12, 2014Second resubdivision of a portion of lot 1 block 6 banister acres · 170 m away
- 4401 Gillis StMar 6, 20242-story secondary apartment [2bed 2.5bath] with attached 1-car garage · 175 m away
- 1405 Casey StApr 2, 2026Replacement of complete existing central heat and air system with or without duct work · 180 m away