1505 Brackenridge St
Austin, TX 78704
1505 Brackenridge St: 1 project on record
City of Austin lists 1 filing across 1 project at 1505 Brackenridge St, Austin, TX 78704. The most recent, filed January 30, 2025, covers: “Accessing water line by shovel will be replacing water line from house to meter”.
Compiled from City of Austin records · updated Jan 30, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 30, 2025
- since Jan 30, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledAccessing water line by shovel will be replacing water line from house to meter
- AppliedJan 13, 2025
- IssuedJan 30, 2025
- WorkJan '25 – Mar '25
- Final inspectionMar 7, 2025
Passed final inspection Mar 7, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectAccessing water line by shovel will be replacing water line from house to meter
Accessing water line by shovel will be replacing water line from house to meter
City of Austin permitPlumbing PermitFinal- Record
- 2025-003939 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1505 Brackenridge St
What is being built at 1505 Brackenridge St?
The latest filing (City of Austin permit 2025-003939 PP, January 30, 2025) covers accessing water line by shovel will be replacing water line from house to meter.
How many permits and filings does 1505 Brackenridge St have?
1 filing across 1 project, from January 30, 2025 to January 30, 2025.
Is there other construction near 1505 Brackenridge St?
Yes. Nearby filings include 1504 Drake Ave (accessing water line by shovel will be replacing water line from house to meter. replace sewer line from house to city, Feb 11, 2025); 206 Elizabeth St (fairview park block 12; amended plat of lots 6, 7 & 8 — fairview park block 12; amended plat of lots 6, 7 & 8, Jan 28, 2009); 221 Park Ln (park lane guest house, Feb 8, 2011).
How do I get alerts for new permits at 1505 Brackenridge St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 1504 Drake AveFeb 11, 2025Accessing water line by shovel will be replacing water line from house to meter. replace sewer line from house to city · 18 m away
- 206 Elizabeth StJan 28, 2009Fairview park block 12; amended plat of lots 6, 7 & 8 — fairview park block 12; amended plat of lots 6, 7 & 8 · 69 m away
- 221 Park LnFeb 8, 2011Park lane guest house · 73 m away
- 205 E Elizabeth StFeb 25, 2024Repair rodent chewed wire and install new gfci outlet · 82 m away
- 301 Park LnJan 28, 2025Construct new driveway approach of 20 ft and sidewalk of 20 lf and curb & gutter of 20 ft. driveway is on drake ave · 97 m away
- 1501 Nickerson StAug 14, 2025Install level 2 ev charger · 105 m away
- 303 Park LnNov 25, 202540ft of water line replacment · 117 m away
- 1407 Drake AveJul 14, 2026Replacement of an existing water heater · 131 m away
- 1422 Newning AveNov 6, 2026Base: installing a backup battery system and additional meter socket · 132 m away
- 1603 Brackenridge StOct 2, 2024Replacement of complete existing central heat and air system with or without duct work · 132 m away
- 405 E Monroe StJul 28, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton gas system · 154 m away
- 1505 Newning AveJun 1, 2024Replacement of complete existing central heat and air system with or without duct work · 170 m away