groundranger
Recent · latest filing Apr 2026Residential

1516 Treadwell St

Austin, TX 78704

Foundation repair and EV charger permitted at 1516 Treadwell

Austin permits at 1516 Treadwell St cover foundation repair and installation of an electric vehicle charger. The foundation repair permit was filed Dec. 1, 2025, and the charger permit was filed Apr. 16, 2026; both are marked final.

Summarized from City of Austin records · updated Apr 16, 2026

Projects
2
2 filings
Latest filing
Apr 16, 2026
since Dec 1, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Installation ev charger: emporia classic j1772. hard wire emporia classic on the interior back garage wall. route wiring directly behind the 150-amp main panel. the charger will be installed on a 60-amp circuit and will draw up to 48 amp continuous

  1. AppliedApr 15, 2026
  2. IssuedApr 16, 2026
  3. WorkApr '26 – Jun '26
  4. Final inspectionJul 13, 2026

Passed final inspection Jul 13, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Installation ev charger: emporia classic j1772. hard wire emporia classic on the interior back garage wall. route wiring directly behind the 150-amp main panel. the charger will be installed on a 60-amp circuit and will draw up to 48 amp continuous

    Installation ev charger: emporia classic j1772. hard wire emporia classic on the interior back garage wall. route wiring directly behind the 150-amp main panel. the charger will be installed on a 60-amp circuit and will draw up to 48 amp continuous

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Express- foundation repair

    Express- foundation repair

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1516 Treadwell St

What is happening at 1516 Treadwell St in Austin?

City of Austin records show a foundation repair permit and a permit to install an electric vehicle charger at the residential property.

Is a new building being built at 1516 Treadwell St?

The records provided show foundation repair and an EV charger installation, not a new building project.

Is an EV charger being installed at 1516 Treadwell St?

Yes. Permit 2026-046279 EP, filed April 16, 2026, covers a hardwired Emporia Classic J1772 charger on a 60-amp circuit. The permit is marked final.

What foundation work is permitted at 1516 Treadwell St?

Permit 2025-150329 BP, filed Dec. 1, 2025, is described as express foundation repair. It is marked final.

When were the permits filed for 1516 Treadwell St?

The foundation repair permit was filed Dec. 1, 2025, and the EV charger electrical permit was filed Apr. 16, 2026.

Also being built nearby

All of 78704
Email me when a new permit is filed