1710 Bartoncliff Dr

Austin, TX 78704

1710 Bartoncliff Dr solar and backup electrical work

An Austin permit dated September 23, 2025, covers a roof-mounted 8.28-kW solar system with 18 panels, one energy storage system, a Tesla Gateway 2, and a backup load panel at 1710 Bartoncliff Dr. A May 14, 2025, permit covers work to correct the gateway and meter connection; a December 20, 2023, permit records a 225-amp main breaker panel replacement and Level 2 EV charger installation.

Summarized from City of Austin records · updated Sep 23, 2025

Projects
3
3 filings
Latest filing
Sep 23, 2025
since Dec 20, 2023
Largest scope
—
Listed value
—

Where this project stands

Finaled

Pv roof mount 8.280 kw 18 panels1 essnew tesla gateway 2new backup load panel and an existing electrical panel

  1. AppliedJan 3, 2025
  2. IssuedSep 23, 2025
  3. WorkSep '25 – May '26
  4. Final inspectionDec 10, 2025

Passed final inspection Dec 10, 2025.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Pv roof mount 8.280 kw 18 panels1 essnew tesla gateway 2new backup load panel and an existing electrical panel

    Pv roof mount 8.280 kw 18 panels1 essnew tesla gateway 2new backup load panel and an existing electrical panel

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Request to disconnect new tesla gateway3 previous contractor - if you call them that - cut meter seal and ran wires through lbs to new tesla gateway. previous contractor - removed fitting between main panel and meter and covered exposed holes with duct tape previous contractor - installed tesla gateway too close to main panel previous contractor - installed wrong pv meter and disco we would like to fix all of this! we are going to transfer the existing solar permit (aux permit) to boost as well to finalize solar after we fix meter connection to tesla gateway we are not changing out existing rev meter only working on the load side

    Request to disconnect new tesla gateway3 previous contractor - if you call them that - cut meter seal and ran wires through lbs to new tesla gateway. previous contractor - removed fitting between main panel and meter and covered exposed holes with duct tape previous contractor - installed tesla gateway too close to main panel previous contractor - installed wrong pv meter and disco we would like to fix all of this! we are going to transfer the existing solar permit (aux permit) to boost as well to finalize solar after we fix meter connection to tesla gateway we are not changing out existing rev meter only working on the load side

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Request to disconnect - replace 225-amp main breaker panel and install level 2 evse

    Request to disconnect - replace 225-amp main breaker panel and install level 2 evse

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1710 Bartoncliff Dr

What is being installed at 1710 Bartoncliff Dr?

An Austin permit dated September 23, 2025, describes a roof-mounted 8.28-kW solar system with 18 panels, one energy storage system, a Tesla Gateway 2, and a backup load panel.

Is there a battery or energy storage system in the permit?

Yes. The September 23, 2025, permit describes one energy storage system, but does not specify its brand or capacity.

What does the May 2025 permit at 1710 Bartoncliff Dr cover?

Permit 2025-053940 EP, dated May 14, 2025, covers corrections involving the Tesla Gateway and meter connection. The description says the existing solar permit would be transferred to a new contractor.

What is permit 2025-000658 EP for?

The September 23, 2025, permit covers a roof-mounted solar installation with 18 panels, an energy storage system, a Tesla Gateway 2, and a backup load panel.

Was an electric vehicle charger permitted at this address?

Yes. Permit 2023-159449 EP, dated December 20, 2023, covers replacement of a 225-amp main breaker panel and installation of a Level 2 EVSE.

Are these permits for a new home?

The records provided describe electrical work at a residential address, including solar, energy storage, and an EV charger. They do not describe construction of a new home.