1812 Dywer Ave
Austin, TX 78704
1812 Dywer Ave: 2 projects on record
City of Austin lists 2 filings across 2 projects at 1812 Dywer Ave, Austin, TX 78704 since March 12, 2024. The most recent, filed April 18, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Apr 18, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Apr 18, 2024
- since Mar 12, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedApr 16, 2024
- IssuedApr 18, 2024
- WorkApr '24 – May '24
- Final inspectionMay 9, 2024
Passed final inspection May 9, 2024.
1 contact on this project
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-047388 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace gas pipe to central heat remove failed section of gas pipe from 90 in attic above heater all the way to the unit. tie in to gas pipe in attic and run new 1/2â� drop down wall. pipe out of wall to heating unit. run hard pipe out of unit and plumb in sediment trap. new gas flex line included. sheetrock will need to be cut inside heater closet to gain access. reliant plumbing is not responsible for sheetrock repair. fittings to be used may include threaded fittings and mega press fittings. all materials used will be code approved
Replace gas pipe to central heat remove failed section of gas pipe from 90 in attic above heater all the way to the unit. tie in to gas pipe in attic and run new 1/2â� drop down wall. pipe out of wall to heating unit. run hard pipe out of unit and plumb in sediment trap. new gas flex line included. sheetrock will need to be cut inside heater closet to gain access. reliant plumbing is not responsible for sheetrock repair. fittings to be used may include threaded fittings and mega press fittings. all materials used will be code approved
City of Austin permitPlumbing PermitFinal- Record
- 2022-003421 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1812 Dywer Ave
What is being built at 1812 Dywer Ave?
The latest filing (City of Austin permit 2024-047388 MP, April 18, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 1812 Dywer Ave have?
2 filings across 2 projects, from March 12, 2024 to April 18, 2024.
Is there other construction near 1812 Dywer Ave?
Yes. Nearby filings include 1814 Dywer Ave (access by tunnel to repair failed drain pipping, Jul 20, 2026); 1816 Dywer Ave (express: replacing 2 windows like for like, Oct 19, 2026); 1813 Margaret St (adding a back up generator with an alternative transfer switch, Jun 25, 2025).
How do I get alerts for new permits at 1812 Dywer Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 1814 Dywer AveJul 20, 2026Access by tunnel to repair failed drain pipping · 23 m away
- 1816 Dywer AveOct 19, 2026Express: replacing 2 windows like for like · 40 m away
- 1813 Margaret StJun 25, 2025Adding a back up generator with an alternative transfer switch · 45 m away
- 1817 Dywer AveMay 2, 2024Replacement of complete existing central heat and air system with or without duct work · 57 m away
- 1809 Margaret StOct 13, 2026Expedited review - new construction of a 2-story single family res. [4bed 5.5bath] with basement outdoor kitchen and attached carport · 59 m away
- 1818 Dywer AveOct 30, 2025Express- replace 8 existing windows - size for size · 61 m away
- 1817 Margaret StFeb 11, 2026Replacement of an existing water heater replace 40-gallon gas water heater location: garage · 62 m away
- 1820 Dywer AveMay 21, 2024Replacement of complete existing central heat and air system with or without duct work · 79 m away
- 1816 Spillman StFeb 20, 2024Replacement of an existing water heater · 81 m away
- 1809 Spillman StNov 5, 2026Replacement of mini-split system multizone mini split system with 2 indoor heads · 81 m away
- 1812 Margaret StNov 3, 2026Eplan: residential expedited review - new construction of a 2-story duplex [4bed 4bath]. unit a · 85 m away
- 1818 Spillman StJul 6, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out only · 86 m away