2001 Alta Vista Ave
Austin, TX 78704
2001 Alta Vista Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 2001 Alta Vista Ave, Austin, TX 78704. The most recent, filed February 19, 2024, covers: “Tee into external gas line and run additional line for generator installation”.
Compiled from City of Austin records · updated Feb 19, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 19, 2024
- since Feb 19, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTee into external gas line and run additional line for generator installation
- AppliedFeb 6, 2024
- IssuedFeb 19, 2024
- WorkFeb '24 – May '24
- Final inspectionMay 9, 2024
Passed final inspection May 9, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectTee into external gas line and run additional line for generator installation
Tee into external gas line and run additional line for generator installation
City of Austin permitPlumbing PermitFinal- Record
- 2024-015115 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2001 Alta Vista Ave
What is being built at 2001 Alta Vista Ave?
The latest filing (City of Austin permit 2024-015115 PP, February 19, 2024) covers tee into external gas line and run additional line for generator installation.
How many permits and filings does 2001 Alta Vista Ave have?
1 filing across 1 project, from February 19, 2024 to February 19, 2024.
Is there other construction near 2001 Alta Vista Ave?
Yes. Nearby filings include 2003 Alta Vista Ave (**request to disconnect** replacing main breaker panel (200 amp) ****not replacing meter, Mar 21, 2024); 2005 Alta Vista Ave (replacement of an existing water heater, Jan 12, 2024); 1910 Travis Heights Blvd (request to disconnect relocating service from house over to detached garage to me ae service drop length requirements. will keep existing panel location on home but re doing panel and installing a new overhead feeder from the new service location to the panel. will also be updating grounding system and adding proper surge protection. added 2 circuits for gfci protection in detached garage, May 7, 2025).
How do I get alerts for new permits at 2001 Alta Vista Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 2003 Alta Vista AveMar 21, 2024**request to disconnect** replacing main breaker panel (200 amp) ****not replacing meter · 18 m away
- 2005 Alta Vista AveJan 12, 2024Replacement of an existing water heater · 35 m away
- 1910 Travis Heights BlvdMay 7, 2025Request to disconnect relocating service from house over to detached garage to me ae service drop length requirements. will keep existing panel location on home but re doing panel and installing a new overhead feeder from the new service location to the panel. will also be updating grounding system and adding proper surge protection. added 2 circuits for gfci protection in detached garage · 48 m away
- 900 Rosedale TerApr 15, 2016Amending plat of lots a & b, amending plat of lots 1, 4, & 5 block 13 · 53 m away
- 2004 Travis Heights BlvdNov 7, 2025Replacement of complete existing central heat and air system with or without duct work · 56 m away
- 2000 Alta Vista AveJul 22, 2024Complete interior remodel of entire house. interior addition of power room mud room library/ guest bathroom 3 and relocation of laundry room · 66 m away
- 806 Rosedale TerNov 16, 2026New residential pool · 79 m away
- 2101 Alta Vista AveDec 28, 2023Gas pipe install for home generator · 97 m away
- 2012 Travis Heights BlvdOct 24, 2025Install/replace 200 amp main breaker panel and meter can (overhead) · 102 m away
- 2005 Alameda DrDec 19, 2025Replacing 45ft of water supply line from meter to the house as well as whole house repipe to fixtures · 110 m away
- 2007 Alameda DrMar 24, 2026Installed double check valve for coffee maker · 114 m away
- 1907 Travis Heights BlvdAug 10, 2026Backup battery system along with new main service disconnect. no updates to utility meter only will be disconnecting and reconnecting after job completion · 114 m away